How The Assessment Of Construction Can Make Or Break A Project Term Paper

PAGES
5
WORDS
5147
Cite
Related Topics:

BCA Capability Report project 2- New 3 storey Dwelling design

Further to our engagement in relation to the above project, please find attached the Capability Report relating to our assessment of the building against the applicable requirements of the Building Code of Australia.

Should you have any comments regarding the assessment or any matter raised in the report, please contact the undersigned.

Yours faithfully

Encl.

BUILDING CODE OF AUSTRALIA 2015

CAPABILITY REPORT

Prepared for

OTEN

[email protected]

PREMISES

57 Brandling St. Alexandria, Sydney

DRAFT

Date: 6 April 2018

Ref. No: BCACRP2

Your company details

Table of Contents

CONTENTS Page No.

1.0 Executive Summary 4

1.1 Report purpose 4

1.2 Report methodology 4

2.0 Property Description 4

2.1 Location 4

2.2 Description of works 4

2.3 Building Description 5

Volume 2 - Part 3.0 6

3.0 Building Code of Australia Assessment 6

3.1 Site Preparation 6

3.2 Footings and Slabs 6

3.3 Masonry 6

3.4 Framing 7

3.5 Roof and wall cladding 7

3.6 Glazing 7

3.7 Fire Safety 7

3.8 Health and Amenity 8

3.9 Safe Movement and Access 8

3.10 Additional Construction Requirements 9

3.11 Structural Design Manuals 9

3.12 Energy Efficiency 10

4.0 Recommendations 11

5.0 Conclusion 12

6.0

Sources Used in Documents:

References


City of Sydney, (last updated, April 2015). Building and construction approvals. Construction regulation. Sydney City Council. Accessed 9 April 2018< http://www.cityofsydney.nsw.gov.au/development/building-and-construction-approvals>


City of Sydney, (last updated January 2018). Construction regulation. Sydney City Council. Accessed 9 April 2018 < http://www.cityofsydney.nsw.gov.au/development/building-and-construction-approvals/construction-regulation>



Cite this Document:

"How The Assessment Of Construction Can Make Or Break A Project" (2018, April 10) Retrieved April 29, 2024, from
https://www.paperdue.com/essay/assessment-construction-break-project-term-paper-2177651

"How The Assessment Of Construction Can Make Or Break A Project" 10 April 2018. Web.29 April. 2024. <
https://www.paperdue.com/essay/assessment-construction-break-project-term-paper-2177651>

"How The Assessment Of Construction Can Make Or Break A Project", 10 April 2018, Accessed.29 April. 2024,
https://www.paperdue.com/essay/assessment-construction-break-project-term-paper-2177651

Related Documents

E. Sharpe, Inc., 1997. Gambatese, John a. "Liability in designing for construction worker safety." Journal of Architectural Engineering: September 1998: 107-112. Gitter, Robert J. "Wage Subsidy Programs in Apprenticeship Training in the Construction Industry." Journal of Vocational and Technical Education Fall 1985: 3-10. Gould, John P. And Bittlingmayer, George. The Economics of the Davis-Bacon Act: An Analysis of Prevailing-Wage Laws. Washington D.C.: American Enterprise Institute of Public Policy Research, 1980. Korman, Richard, Kohn, David

Building Materials If one is going to build a home or a business, one needs good materials with which to construct those dwellings. However, most of the materials that are used in construction projects in Iran are far from meeting international standards (Babai, 2011). They are of a low quality, and they do not hold up in the way that they would if high quality materials had been used. Many of

"Brainstorming, scenario planning, and expert interviews is the tools highway engineers commonly use in routine engineering and construction management tasks." (U.S. Department f Transportation 2007 P. 2). Table 3 reveals the summary of the tools and technique in the risk identification process. Table 3: Risk identification tools and techniques PROJECT-SPECIFIC DOCUMENTS PROGRAMMATIC DOCUMENTS TECHNIQUES Project description Work breakdown structure (WBS) Cost estimate Construction schedule Procurement plan Team issues and concerns Historic data Checklists Final project reports Risk response plans Organized lessons learned Published commercial databases Academic

This would help to cut costs, and was seen as a significant problem as evidenced by the table on page 2. Another important issue was the consequences of using construction material that is substandard, meaning that the materials may be more difficult to work with and they not be as reliable and durable. Most individuals did not want to use these products, but there are often no other choices.

In addition, Sound Transit has installed eight sensing devices for the building, including probes that would register any soil shifting at the tunnel depth. Such alerts would allow Sound Transit time to apply extra grout between the tunnel and the apartment building's basement. 6. Output Analysis and Discussion Here, Sound Transit has taken reasonable and economically feasible precautions to reduce the risk of damage from soil sliding. At this point, the remaining

Construction Contracting PARTNERING AGREEMENT THIS PARTNERING AGREEMENT (this "Agreement"), is entered into on ____, by and between Capitol Home Improvement, LLC ("Capital Home Improvement") and The KEIMA CONSTRUCTION Corporation ("KEIMA CONSTRUCTION"). WHEREAS, KEIMA CONSTRUCTION represents that it has expertise in the area of [specify area of expertise of which partner is sought], and is ready, willing, and able to provide assistance in that area to CAPITOL HOME IMPROVEMENT and to the client of