Breakeven analysis of conveyor system versus dock expansion at Excellent Beer
✍️ How to write this paper — writing tools ▾
Breakeven
Excellent Beer & Beverage Distributors
Company email
FROM: Ross Terna, Manager of Purchasing
Danny Wilco
Re: Quotes on Dock & unloading improvements
I am summarizing the information that we received from Acme Material Handling and Jones Construction regarding their quotes/bids on the work we requested. ~RT
ACME MATERIAL HANDLING QUOTE:
• 1 Acme Speed Roller Conveyor system
• Operating Specs: conveyor speed: 3 ft / second, Max spot load: 250 lb., length 45 ft., width, 3.3 ft.
• Price: $225,000
• Delivery: within 3 weeks upon receipt of order, 20% due on order, 80% due 45 days upon delivery
JONES CONSTRUCTION QUOTE:
• Demolition and rebuild loading dock to include 7.5 ft expansion on length.
• All labor, materials, and other expenses included in price: $175,000.
• Construction starts within 10 days of receipt of order and 10% payment. Estimated construction time is 21 days, with 50% due at completion. Balance of 40% due within 30 days.
NOTES:
Acme Speed Roller
• Estimated annual maintenance costs: $8,200.
• Estimated operating costs, including electric, $1.75-hour.
• Estimated time to unload a vendor delivery: 6.1 trucks / hour, or 9.84 minutes/truck • Annualize purchase price over 10 years is $22,500.
Create your account
Always verify citation format against your institution’s current style guide requirements.