Iranian Construction Projects Are A Essay

Iran must explore new and better ways of constructing buildings so that safety becomes the most important factor. By looking at and examining the obstacles that the Iranian construction industry faces and gaining a better understanding of these is key to ensuring that in the future there is a chance that construction in Iran is safer, cheaper and overall better for everyone. Positive solutions can come from this research and study and new, safer methods and practices can be implemented to ensure that construction in Iran is successful.

Conclusion

In conclusion it is apparent that Iran must explore new and better ways to fund construction projects and programs as well as find ways to ensure that the buildings that are built are constructed safely. The obstacles and issues that Iran faces in the construction sector are numerous and will be difficult to overcome, but to study and better understand these obstacles Iranians can learn from past mistakes and implement new ideas and methods to improve the quality of Iranian construction work. Finding positive solutions to Iranian construction issues would greatly help out Iran's entire economy and society as a whole.

Construction delays are a constant struggle in Iran because of some major national issues. Inflation...

...

This high inflation along with Iran's weak private sector are two harsh factors that Iranian construction companies face; loans, startup capital and financing are scarce as Iran's entire economy relies so heavily on oil and its market price. This one dimensional economy along with the fact that Iran and its government have a negative standing with the rest of the world cause Iran's construction industry many problems. These state and economic obstacle factor in all of the problems and struggles facing construction in Iran.
Education and the advancement of knowledge in building design and industry intelligence is another obstacle that Iran faces in the construction industry. Iran lacks the training programs, computer software and experience with new technologies which causes an abundant amount of safety and time concerns which in turn cause costs to increase. High costs and low quality are often results in Iranian construction but in order for this to be corrected these issues need to be identified and steps need to be made in the right direction for Iran's construction industry to be successful. It will be a long road but the safety and economic development of Iran depends on a strong and dynamic construction industry.

Cite this Document:

"Iranian Construction Projects Are A" (2011, November 20) Retrieved April 24, 2024, from
https://www.paperdue.com/essay/iranian-construction-projects-are-a-47704

"Iranian Construction Projects Are A" 20 November 2011. Web.24 April. 2024. <
https://www.paperdue.com/essay/iranian-construction-projects-are-a-47704>

"Iranian Construction Projects Are A", 20 November 2011, Accessed.24 April. 2024,
https://www.paperdue.com/essay/iranian-construction-projects-are-a-47704

Related Documents

Building Materials If one is going to build a home or a business, one needs good materials with which to construct those dwellings. However, most of the materials that are used in construction projects in Iran are far from meeting international standards (Babai, 2011). They are of a low quality, and they do not hold up in the way that they would if high quality materials had been used. Many of

Inexcusable delay - these postponements outcome from a contractor's own fault or his subcontractors or substantial dealers Table 3-1 the Most Important Delay Factors According to Contractors Type Delay factor Rank Scheduling Preparation and approval of shop drawings 1 Financing Delays in contractors progress payment by owner 2 Changes Design change by owner during construction 2 Material Delay in the special manufacture out side of Saudi Arabia 4 Financing Owners cash problems during construction 5 Contractual relationship Slowness of owner's decision making process 6 Material Slow delivery of construction material 7 Changes Design errors made by designers 7 Scheduling Waiting for

This would help to cut costs, and was seen as a significant problem as evidenced by the table on page 2. Another important issue was the consequences of using construction material that is substandard, meaning that the materials may be more difficult to work with and they not be as reliable and durable. Most individuals did not want to use these products, but there are often no other choices.

E. Sharpe, Inc., 1997. Gambatese, John a. "Liability in designing for construction worker safety." Journal of Architectural Engineering: September 1998: 107-112. Gitter, Robert J. "Wage Subsidy Programs in Apprenticeship Training in the Construction Industry." Journal of Vocational and Technical Education Fall 1985: 3-10. Gould, John P. And Bittlingmayer, George. The Economics of the Davis-Bacon Act: An Analysis of Prevailing-Wage Laws. Washington D.C.: American Enterprise Institute of Public Policy Research, 1980. Korman, Richard, Kohn, David

This is when the available supply will address demand. References Construction Logistics Management, 2010, CMS. Available from: [21 February 2012]. Construction Materials, 2009, Encyclopedia Iranica. Available from: [18 February 2012]. Iran, 2012, CIA. Available from: [17 February 2012]. Iran's Budget Shortfalls, 2009, PR Log. Available from: [21 Feb 2010] Iran Building Construction and Investment Opportunity, 2011, Business Wire. Available from: [20 February 2012]. Iran's Real Estate and Construction Industry, 2011, Dazzel

Respondents to the questionnaire, who are in a first-hand position to assess the construction industry in Iran, agree on what all of the basic problems are and on many of the interrelationships and influences that these problems have on each other and on the industry itself. They are also in relatively strong agreement that Iran's foreign policy and its overall position in the geopolitical environment are having direct negative impacts