Bill of material explosion and input/output control in manufacturing
✍️ How to write this paper — guide & tools ▾
¶ … Control Processes in Manufacturing
If you were the manufacturing manager for a company that manufactures travel luggage, how would you describe the concept of "explosion" and what would you include in your description?
When a material is allocated to a bill of material (BOM), to a sales order BOM, or when a WBS BOM is allocated to an activity, each BOM can be exploded in the network level-by-level or completely, which is called multi-level explosion (Swamidass, 2000). The reasons for exploding a bill of material include: 1) A desire to maintain subordinate components in the BOM; 2) although the header material was not planned using MRP, it is desirable to trigger MRP for subordinate components; and 3) it is desirable to change the structure of the bill of material as it is presently configured in the network (Swamidass, 2000).
Create your account
Always verify citation format against your institution’s current style guide requirements.