Guarding against cost underestimation in IT acquisition projects

~11 min read
Abstract

Business performance and IT acquistion issues are becoming more complex and standardized because of a variety of management tools. This assignemnt reviews how some IT methods are used and the care that companies may need to take as they grow into Cloud technologies.

✍️ How to write this paper — writing tools ▾
Essay 2,183 words

IT Acquisition. Version 2.0

I have added info to the last three questions, and changed quite a bit Question #4. The area in yellow are new or changed. I did make a few corrections elsewhere too so if this works you might want to look over each completely.

What can an organization do to guard against funding proposed projects that intentionally or unintentionally underestimate the costs, do not fully communicate the risks, and/or otherwise exaggerate the likely financial benefits? Explain your answer.

If the answers provided in questions 1 and 2 above are properly followed, then the chances of these kinds of problems will be greatly diminished. The previous suggestions should ensure that our team has undertaken the due diligence needed to try to ensure that either purposeful or unintentional errors of these kinds cannot get into their proposal. We have already double and triple checked the financial and project elements and thought through (as we continue to do) many of the hidden elements that can result in other unexpected costs.

One of the most often overlooked issues is the variability of pricing in high-technology equipment and capabilities. Advancements in computer functionality and even size can often lead to the need for new items (which can add some costs) or can even result in dramatic cost reductions. It is particularly important to see that the proposal reflects and awareness of this and is able to be adjusted accordingly. If the costs go up as new elements are added, the original planning should allow for this to stay within budget constraints. Then too the proposal should anticipate reductions and either redirect that money or reflect it in lower costs over time.

However, at this point we would also look at making much greater use of the "just in time" budgeting, such as is now being used by some levels of the federal contracting services. Not a new concept since parts of the government and business have been using it for years, there has been a resurgence in the idea during these volatile economic times. The basic idea is that project providers, working with the buyer, create a number of budgeting options for continuous monitoring, what might be called role-laying experiments and other types of budget monitoring. These are essentially experimental budgeting options created to meet and test unique circumstances. While the original budget has to be correct and as well developed as feasible, once contracting is formally authorized, a number of steps are put into place to reconfigure the budget as circumstances change. This is not meant to penalize the provider (necessarily) as much as it is to help both parties to keep abreast of real-time considerations. This kind of flexible budgeting is also well adapted to the creative elements mentioned before.

Some of the best benefits of this method are that they can be set up with serious auditing tests integrated into what are basically risk experiments. As the two parties work to keep on top of true cash flow and budget ups and downs, it is possible as well to set up controlled scenarios that will help judge if certain components of the budget are within realistic parameters. If they are and all else goes well, this may ensure that the provider companies would be in a good position to qualify for incentives, which can be great for both parties because the full cost of the project will not be exceeded and the provider will be rewarded for doing better than expected.

Another contemporary consideration may have to do with the calculations used to undertake a quality risk assessment. Risk analyses need to be tied to the company's mission and to its strategic use of IT elements. The proposal should be able to demonstrate how the cost and benefit analysis was made, including specific dollar estimates for everything from initial costs, ongoing assumptions, compatibility, limitations of capacity, and security evolutions. If the initial projections, for example, contemplated limited external access to some sensitive sites because of safe-guarding vulnerabilities, this factor may be very significant as add-on security systems come within reach. Similarly, missions evolve in companies with major IT components based on user desires and this too could require accurate risk management reconsiderations.

1,482 Words Hidden
The budgetary aspects of these considerations should be evident from the beginning and should be able to be reviewed over time. Question 4: Which group…