Verified Document

Toronto Stinks Read Here Http://www2.macleans.ca/2009/07/22/toronto-stinks/2 Article Critique

This is to indicate that Toronto does not have adequate analytical human capital present to properly analyze the entire nature of this environmental economic disaster. Summary and Conclusion

The unsanitary and unhealthy environmental impact rendered from discontinued municipal sanitation services for a metropolis the size of Toronto is a common problem. Throughout the world, there are cities and urban centers with no landfill space and that lack a comprehensive sanitation pickup and removal system. Toronto is not alone in facing fiscal constraints against the operating budget but still must weigh the cost against the benefits of renewing "grandfathered" contracts from old administrations. If the city allows itself to be crippled by the demands of a powerful union then the constituency will be forced to pay more for services that a strong Mayor/Council would have negotiated for.

To avoid a disaster a 3rd time around, the city must create a contingency plan that enables trash removal and sanitation services if they choose not to enact a competitive bid process resulting in another labor strike. The contingency plan is relatively simple as it allows the city to hire replacement sanitation workers to bring trash to designated receptacle...

Such a plan hinders the negotiating power of the union due to the ability of the city to continue its operations unabated. To continue operating without a contingency plan after the 2002 sanitation debacle exhibits a lack of long-term strategic planning from the city.
There must be a strategic planning document created by the Mayor and signed by the Council at every election cycle. The plan must be comprehensive and forecast the next 10 to 20 years and describe where the city wants to be, what it needs to get there, what it has now, and what it has to do (or get) to reach its goals. The plan should be updated as new Mayor/Council is brought in and if changes to the direction of the plan are desired, a public vote must be cast with 3/5 as the majority for override.

References

Charlie Gillis and Kate Lunau. Toronto stinks. July 22, 2009. Retrieved from: http://www2.macleans.ca/2009/07/22/toronto-stinks/2/

Chaz Miller. Garbage & Health. July 1st, 2003 Retrieved from: http://wasteage.com/mag/waste_garbage_health/

Lee, Jones-Lee. Impact of Municipal and Industrial Non-Hazardous Waste Landfills on Public Health and the Environment: An Overview. Retrieved from: http://www.gfredlee.com/cal_risk.htm

Sources used in this document:
References

Charlie Gillis and Kate Lunau. Toronto stinks. July 22, 2009. Retrieved from: http://www2.macleans.ca/2009/07/22/toronto-stinks/2/

Chaz Miller. Garbage & Health. July 1st, 2003 Retrieved from: http://wasteage.com/mag/waste_garbage_health/

Lee, Jones-Lee. Impact of Municipal and Industrial Non-Hazardous Waste Landfills on Public Health and the Environment: An Overview. Retrieved from: http://www.gfredlee.com/cal_risk.htm
Cite this Document:
Copy Bibliography Citation

Related Documents

Landfill Recycling Concrete V. Placing It in
Words: 1452 Length: 5 Document Type: Essay

Landfill Recycling Concrete v. Placing it in a Landfill: A Comparison of Greenhouse Gas Emissions As one of the most abundantly used resources in the world -- second only to water, according to some measures -- determining what to do with concrete once it is no longer needed in its original application is a major issue. Most of the time, waste concrete is not structurally flawed or degraded, but the building or

Landfills and Landfill Gas: Land-Filling Is One
Words: 648 Length: 2 Document Type: Essay

Landfills and Landfill Gas: Land-filling is one of the most popular and widely used method of disposing different types of waste materials, more specifically Municipal Solid Waste (MSW), in many countries. In order to fulfill the federal regulations, the landfills are designed and operated in an efficient way and are located in such areas which are away from the residential areas. It is essential to carefully monitor this whole process, as

Economic Benefits of Landfill Mining
Words: 4223 Length: 15 Document Type: Term Paper

9% Yard Trimmings - 12.9% Food scraps - 12.4%; Plastics - 11.7%; Rubber, leather and textiles - 7.3% Metals - 7.6% Wood - 5.5% Glass - 5.3% The following figure shows the number of landfills in the United States between 1998 and 2006 Number of Landfills in the United States 1998-2006 Source: EPA (1997) The work of van der Zee and de Visser entitled: "Assessing the Opportunities of Landfill Mining" states: "Long-term estimates make clear that the amount of solid waste

Analyzing and Developing a Landfill for Disposing Hazardous Material...
Words: 810 Length: 2 Document Type: Essay

Landfill for Disposing Hazardous Material Challenges Resistance of the public to siting a waste management facility While citizens are thankful for convenient existing locations for dumping garbage, recyclables, and yard waste, it may be rather hard to gain their acceptance with regard to waste management facility sites (Walker, 2012). Community planning in relation to waste management facility Land-use planning for a community seldom takes into consideration waste management site locations in its community design.

Alternative Landfill Covers: Time for
Words: 2539 Length: 10 Document Type: Term Paper

Whereas conventional, compacted clay barriers are designed to prevent the infiltration of water into the waste below the cover, evapotranspiration takes a decidedly different approach. The cover technique actually uses to its advantage the high water storage capacity of fine grained soils to retain water in the soil above the waste and refuse. The water is "stored" in that layer until it is released back into the atmosphere either

Waste Management As a Result
Words: 2727 Length: 9 Document Type: Term Paper

Post-closure care includes ground water and gas monitoring, leachate collection and treatment, gas recovery and management, and final cover maintenance (Lee, at 35-39). The financial assurance provisions provides a public policy to assure proper funding when a landfill is developed, so that routine maintenance and any necessary remediation work can continue for at least 30 years, even if the owner or operator is no longer in business or financially solvent

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now