Controlling Construction Cost:

It is seldom that the initial bid estimate to carry out a specific construction activity is the same as the actual cost of doing the work. Generally, the estimate cost tends to be higher or lower due to the various unforeseeable factors that contribute to the differences. Therefore, it is increasingly essential for the project manager and contractor to keep current on the costs of a project through maintaining an accurate and reliable cost control system, especially if a contractor is to make a profit. However, the project manager has an overriding role of providing the project management team with necessary strong and proactive leadership during the construction period. This overriding role and task includes ensuring that the most effective approach to control construction has been adopted and tracking construction activities and costs.

Since the construction phase of a project is usually affected by various external factors that hinder the efficient accomplishment of project objectives, the most effective approach to control construction cost is developing mitigating measures for inhibiting factors. This is primarily because these inhibiting factors hinder time and cost control during construction projects (Olawale & Sun, 2010, p.509). The development of mitigating measures is based on the understanding of the distinctive challenges associated with controlling construction project costs and schedules. In addition, these measures enable construction managers to be adequately and better prepared and equipped to face and overcome time and control challenges.

The most common inhibiting factors that contribute to challenges in controlling construction project costs include changes in design, risks and uncertainties, complexities in execution, inaccurate evaluation of the time or duration of the project, and non-performance of subcontractors. Mitigating measures deal with these inhibiting factors since they are classified into preventive, predictive, corrective, and organizational initiatives. Preventive measures act as defense against inhibiting factors since they are precautionary measures established to ensure the effective and efficient execution of the project. In contrast, predictive measures are established so as to detect potential problems to the process of control in the future and ensure adequate preparation to deal with the problems or stopping them from happening. Corrective measures act as remedies through lessening the effect of the project control inhibiting factors. Organizational measures are wider and far-reaching practices that are not limited to the actual control process but have an impact on project control.

259 Words Hidden
Apart from controlling the costs of the project's execution, the other important element in ensuring effective execution of project based on the established goals is…

Already a member? Log in

Unlock the rest of this paper

135,000+ research papers · AI writing tools · Plagiarism & AI detection

Monthly

$12.99Per month

Renews at $12.99/month until canceled

Start Monthly
Best value

Annual

$99Per year

Renews at $99/year until canceled

Start Annual
  • Unlimited AI writing tools
  • Plagiarism and AI text detection tool
Secure checkout

Plan details

Unlimited AI writing tools are for individual, non-automated use and are subject to our Terms of Service and abuse-prevention measures.

TextChecker scans: 3 during the 7-Day Pass, or 5 per month with Monthly and Annual.

Prices exclude applicable tax.

References
4 sources cited in this paper
  • Chartered Institute of Building 2010, Code of practice for project management for construction
  • and development, Wiley-Blackwell, Oxford.
  • Olawale, Y.A & Sun, M 2010, ‘Cost and time control of construction projects: inhibiting factors
  • and mitigating measures in practice,’ Construction Management and Economics, vol. 28, no. 5, pp.509-26.
Cite This Paper
PaperDue. (2014). Mitigating factors inhibiting construction project cost control. PaperDue. https://www.paperdue.com/essay/controlling-construction-costs-and-activities-188813

Always verify citation format against your institution’s current style guide requirements.