Woody's Project Management: The Custom Woodworking Company is relatively a medium sized cabinet and furniture making firm whose headquarters are at Industrial Estates, BC. The founder began the company in 1954 following his apprenticeship as a cabinet maker before moving to the current location in 1959 together with his wife. Woody's currently manufactures custom furniture, typical kitchen and bathroom cabinets, and various wholesaler or retailer furniture products. Following its continual growth since its inception, the company has established a solid reputation for supplying millwork to the construction industry ("Background," 2000).

Project Management in the Construction Industry:

Project Management is a multi-faceted activity with numerous dimensions that are entirely based on the kind and class of project. However, regardless of the project type and class, every level of project management involves the same approach though it's only the branch and size of the activity that varies from project to project (Wideman, 2001). In order to guarantee the success of project management processes, there are several foundational principles of project management that provide the basis for generally acceptable practices. There are two approaches with which companies can create an absolute project management culture and attitude i.e. employing consulting services or creating a Project Management Office.

The construction industry is becoming one of the emerging industries in the field of project management as many construction firms have started to consolidate following years of sustained business improvement. Many firms in the construction industry see the necessity of changing from conventional construction management techniques by adopting new approaches. Consequently, some construction companies have established a Project Management Office similar to those in other mature industries (Gheorghiu, 2008). As compared to the natural stages of maturity development, companies that have adopted a Project Management Office model are experiencing hectic problems.

Woody's Project Management Opportunity:

The opportunity for the Custom Woodworking Company...

The proposals for the company to completely move to new and modern facilities resulted in the polarization of opinions within the firm. The company's Chief Executive Officer called for a meeting of its top officials to resolve the issue and after bitter arguments, it was resolved that the firm would remain in its existing property and location.
In addition, the top officials agreed that the firm's production capacity would be expanded to about 25% of the current floor area including the installation of air-conditioning and dust-free paint and fitting the shop with extra compressor capacity. As a result of the need for semi-automatic woodworking train, necessary software and hardware would be installed to run it. Moreover, the project would also involve the renovation of the President and Executive Vice-President's Office.

Sources of Problems in Woody's Project Management:

As the project implementation process began, there are various problems that were encountered including construction schedule conflicts in tying-in new services because of the two-week slip in delivery schedule. The other significant problems were the need for extra five feet to the new building's length because of the changes in the specifications of production chain and the evident strained relations on the site. Based on the post project appraisal, there were various sources that contributed to the numerous problems including

Un-noticed Over-Supply of Commercial Space:

When the new equipment was eventually launched, it was seriously under-utilized as the production morale faded. One of the major sources of this problem was the un-noticed over-supply of commercial space, which was the basic source of Woody's contracts. Based on the strategy principle of project management, a strategy that includes planning then implementing in a series of progressive phases must be established (Wideman, 2001). The overlooked over-supply of commercial space reveals the lack of a clear strategy…

Sources used in this document:
References:

"Background." (2000). Project Management Case Study: The Custom Woodworking Company

Woody 2000 Project. Retrieved December 21, 2011, from http://www.maxwideman.com/papers/woody2000/background.htm

Gheorghiu, F. (2008, March). Starting A PMO From Scratch: A Challenge or Unbearable

Burden? Retrieved December 21, 2011, from http://www.pmforum.org/library/cases/2008/PDFs/Gheorghiu-3-08.pdf
Introduction. Retrieved December 21, 2011, from http://www.pmforum.org/library/cases/2008/PDFs/Lavell_Martinelli-1-08.pdf
Management Advisory Service, 3(1), 1-6. Retrieved from http://www.ksinc.com/articles/PMFrameworks.pdf
2011, from http://www.maxwideman.com/papers/first_principles/intro.htm
2011, from http://www.maxwideman.com/papers/first_principles/intro.htm
Cite this Document:
Copy Bibliography Citation

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now