Balanced Scorecard in Project Management: Heathrow T5
This paper examines the flexibility of the balanced scorecard model and its application in project management contexts. Using the Heathrow Terminal 5 project as a central case study, the paper demonstrates how traditional balanced scorecard metrics were customized to address the unique challenges of a large-scale, time-limited construction initiative. The discussion covers how non-financial performance indicators were developed alongside financial measures, how the project's insurance and compliance culture supported early issue identification, and how key performance indicators guided project managers toward the broader strategic objectives of the initiative.
- Balanced Scorecard Flexibility and Customization: Overview of the scorecard's adaptability across industries
- The Balanced Scorecard as a Strategic Dashboard: Scorecard as a tool linking financial and non-financial metrics
- Heathrow Terminal 5 as a Project Management Case Study: T5 project scale and the limits of financial metrics
- Adapting the Balanced Scorecard to the T5 Project: Customizing scorecard metrics using rigor framework
- Culture, Compliance, and Collective Accountability: Collective insurance policy and early issue reporting
- Key Performance Indicators and Project Outcomes: Ten KPIs and training driving project success
✍️ How to write this paper — guide, tools & examples ▾
What makes this paper effective
- Grounds an abstract management framework in a concrete, well-documented case study (Heathrow Terminal 5), making the argument easy to follow and credible.
- Clearly identifies the limitations of traditional financial metrics for complex projects and explains why a customized balanced scorecard approach was necessary.
- Incorporates a direct quotation from the T5 Project Director to support the claim that cultural alignment contributed to project success.
Key academic technique demonstrated
The paper uses a single extended case study to illustrate how a theoretical framework (the balanced scorecard) must be adapted when applied to real-world conditions. Rather than surveying multiple examples superficially, it traces the decision-making process within one project — showing how the team evaluated the framework's components, discarded those that did not fit (e.g., the learning and growth perspective), and replaced them with context-specific metrics such as a non-conformance resolution plan.
Structure breakdown
The paper opens with a brief overview of balanced scorecard flexibility, citing Tesco's "Steering Wheel" as evidence. It then introduces the broader management utility of the model before narrowing to the Heathrow T5 case. The discussion moves chronologically through the project's approach: defining metric rigor, customizing the scorecard, establishing a collective insurance culture, and deploying KPIs through training. A short references section closes the paper.
Balanced Scorecard Flexibility and Customization
One of the defining characteristics of the balanced scorecard model is that it is largely flexible and easy to customize to fit a wide range of applications across a variety of industries. The Tesco "Steering Wheel," for example, retains the four main components of the traditional model but adds a fifth perspective — capturing the company's commitment to the community alongside the conventional financial, customer, operations, and people dimensions. The model has also been adapted to meet the unique challenges of the non-profit sector and the service industry.
Another notable application has emerged within the field of project management. Project management requires a significant degree of customization because projects are unique by nature and occur only once. Despite the challenges of adapting the balanced scorecard to a project format, many project managers have been able to use its principles to develop metrics and indicators that guide complex projects. This paper discusses how the balanced scorecard can be applied in a variety of ways within project management.
References
Basu, R., Little, C., & Millard, C. (2009). Case study: A fresh approach of the balanced scorecard in the Heathrow Terminal 5 project. Measuring Business Excellence. Retrieved from http://www.perf-ex.co.uk/wp-content/uploads/2012/04/T5-case-study-MBE-papaer.pdf
CGMA. (2013, June 12). Balanced scorecard. Chartered Global Management Association. Retrieved from http://www.cgma.org/Resources/Tools/essential-tools/Pages/balanced-scorecard.aspx
Create your account
Always verify citation format against your institution’s current style guide requirements.