¶ … resource scheduling and evaluating various methods used to schedule resources in project management. Resource scheduling involves implementing and planning a way of scheduling one's resources. It involves ascertaining that the necessary resources for perpetrating the task are there; that the right resource/s are used; that timing or resource is correct and that there is optimum use of this resource; and that the aggregation of resources is appropriate.

Resource scheduling is important in order to prevent project constraint (problems with competing project). Its benefits are three-fold:

When project delay is unacceptable, resource scheduling allows sufficient time for considering alternatives such as cost-time trade-offs and changing of priorities.

Resource scheduling matches budget with dates so that deadlines are met

Resource scheduling shows project managers amount of flexibility they have with certain resources and how far they can therefore go with their ideas and plans.

There are 3 different types of project constraint:

1. Technological, - the sequence in which individual projects must be completed with each occurring in stages. Example: in building construction, foundation must be poured in before the frame is put up

2. resource - lack of adequate resources for completing a specific stage sometimes forcing simultaneous stages to be completed in tandem

3. Physical. Contractual or environmental conditions that cause difficulty in completing task by deadline such as space limitations may force only one person to paint an entire wall (Gray and Larson, 2003).

Projects are either time constrained...

They are the latter when the availability of resources is depleted / inadequate for completing the task.
This is where resource scheduling comes in.

The process of resource scheduling therefore depends on the particular project.

There are four different ways of doing resource scheduling:

1. resource definition, - identifying the critical resource that needs to be used for this project

2. Resource allocation, - optimum use and timing of specific resources. Particularly important when different resources are competing with each other

3. Resource aggregation, - determining the aggregate resources that will be needed and used period by period for completing project.

4. Resource leveling. -- The available resources are there in order to cover the peaks and slums. Just enough resources are available, not too many or too little.

We will just concentrate on the first two:

1. Resource definition, - identifying the critical resource that needs to be used for this project.

The first step -- or approach - may be the most important where one actually decides and clearly delineates the resource that is needed and amount / quantity of these resources as well as all pertinent details e.g. When it is needed, who supplier will be, who will perform reosurces, buy them,, where stored etc. All details involving this resource are accurately and thoroughly laid out. In the case of HR, the details of the advert / way of procuring necessary labor may also be stepped into. Sometimes the number of units are specified e.g., 5 welders or 3 computer programmers. Other times, resources may be…

Sources used in this document:
Resources

https://courses.worldcampus.psu.edu/welcome/pmanagement/samplecontent/520lesson08/lesson08_01.html
Cite this Document:
Copy Bibliography Citation

Related Documents

Resource Allocation and Reviews the Benefits and
Words: 965 Length: 3 Document Type: Essay

resource allocation and reviews the benefits and challenges of resource scheduling. The project manager is responsible for systematically taking action to facilitate a successful project outcome. The benefits of effective project management include identifying functional responsibilities and time limits for scheduling as well as early detection of problems (Murphy & Ledwith, 2007). To help accomplish these tasks, the project manager uses resource scheduling. The process of resource scheduling is necessary to

Quality of the Optimization for Resource Planning
Words: 2848 Length: 9 Document Type: Essay

Quality of the Optimization for Resource Planning Model by C. Santos et al. (2013) Any multinational organization with more than 100,000 knowledge workers is faced with some profound challenges in harnessing this pool of talent for a diverse set of information technology projects. The resource planning function for Hewlett Packard's Enterprise Services business segment was especially challenged in this area, prompting Santos et al. (2013) to provide a refined model

Subcontracting Analysis Cont'd What Factors
Words: 7083 Length: 26 Document Type: Term Paper

For example, in their study, "Nawkaw, Inc.: Changing the Color of Masonry," Amason and Ciavarella (2001) report that, "Commercial jobs usually were won through competitive bidding by general contractors, who then hired subcontractors. Sometimes general contractors did not seek bids, instead choosing subcontractors on the basis of their past performance" (p. 77). Other factors involved that will likely influence which subcontractor will be selected relate to the organizational structure of

Management and Decision Sciences From
Words: 25680 Length: 90 Document Type: Thesis

76). As automation increasingly assumes the more mundane and routine aspects of work of all types, Drucker was visionary in his assessment of how decisions would be made in the years to come. "In the future," said Drucker, "it was possible that all employment would be managerial in nature, and we would then have progressed from a society of labor to a society of management" (Witzel, p. 76). The

Construction Project Risk Management Risk
Words: 2900 Length: 9 Document Type: Research Paper

5.4: Accept Bullring team accepted some risks; however, the company developed the effective cost and schedule strategies to manage these risks. For example, the company allotted sufficient fund to militate against risks associated with the project costs and schedule. Table 2 presents the compressive list all the risks deemed to affect the outcome of the Bullring project. Table 2: Associated Risks on the Project Cost Related Risks: Index Scores Tight project schedule 0.67 Design variations 0.49 Project variations from

Supply Chain Management Hypothesis Defined Concepts of
Words: 24788 Length: 80 Document Type: Thesis

Supply Chain Management Hypothesis defined Concepts of SCM and the evolution to its present day form Critical factors that affect SCM Trust Information sharing and Knowledge management Culture and Belief -- impact on SCM Global environment and Supply Chain management "Social" and "soft" parameter required for SCM Uncertainties This chapter aims to give an outline and scope of the study that will be undertaken in this work. The study lays out the issues faced by manufacturing organizations when it comes

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now