Managing Change Requests in an Airport Baggage Handling Project

~4 min read
Abstract

This paper examines how Boeing Airport Equipment Automated Systems, Inc. (BAE) should revise its initial policy of rejecting all change requests during the development of an airport baggage handling system (BHS). Written from the perspective of the project manager, the paper identifies two core challenges — workflow disruption and increased costs — and proposes three solutions: maximizing existing project management software, leveraging organizational process assets, and establishing a formal change control board. The paper concludes that systematically absorbing stakeholder input from airlines will improve communication, enhance system design from ergonomic and safety standpoints, and optimize overall workflow.

Key Takeaways
  • Introduction: Project manager argues for revising change-request rejection policy
  • Challenges of Accepting Change Requests: Workflow disruption and cost implications of change requests
  • Project Management Solutions: Three solutions: software, process assets, and change control board
  • Expected Results: Improved communication, design quality, and workflow efficiency
✍️ How to write this paper — guide, tools & examples

What makes this paper effective

  • The memo-style, first-person perspective is appropriate for the scenario and gives the argument a clear authority and decisiveness.
  • The paper directly supports each proposed solution with a textual citation, grounding practical recommendations in project management theory.
  • The three-part solution structure (technology, process assets, change board) is logically sequenced, moving from existing tools to new institutional structures.

Key academic technique demonstrated

The paper demonstrates applied problem-solution structuring: it defines a specific professional problem (a blanket rejection policy for change requests), identifies the risks that policy creates, and proposes actionable, cited remedies. Each solution is mapped to a tangible expected outcome, showing cause-and-effect reasoning that is characteristic of applied project management writing.

Structure breakdown

The paper is organized into four sections. The introduction establishes the professional context and the project manager's rationale for policy revision. The challenges section briefly identifies two risks — workflow disruption and cost increases. The solutions section is the core of the paper, offering three detailed recommendations. The expected results section closes with three projected benefits, tying outcomes back to the solutions proposed. The structure is concise and practitioner-oriented.

Introduction

The baggage handling system (BHS) project is currently underway at Boeing Airport Equipment Automated Systems, Inc. (BAE). Initially, our company stipulated that no change requests would be accepted. However, it has proven impossible to ignore the influx of change requests arriving from major stakeholders — namely, the airlines.

As project manager, I have determined that our policy regarding change requests must itself be revised, both from a practical and a public relations standpoint. We cannot risk further isolating core stakeholders, as doing so creates the danger that the entire project could unravel later due to technical, design, conceptual, or implementation flaws that might otherwise have been caught. It is my responsibility as project manager to attend to these change requests, and I believe that BAE stands to learn a great deal by reading and responding to them. We will do so in a systematic and organized manner.

Challenges of Accepting Change Requests

1. Change requests may interfere with our workflow. Each requested change and recommended action must be processed through the integrated change control process. Approved changes affect the project management plan, which must then be updated accordingly ("Part IV: Monitoring and Controlling the Project," n.d., p. 310).

2. Costs incurred could be significant. The recommended corrective actions, preventive actions, and defect repairs may highlight flaws in our existing planning, resulting in added expenditure.

Project Management Solutions

1. Maximize the use of information technology designed specifically for this project. BAE uses a proprietary project management software platform built specifically for our operations. Upon review, I have determined that we are currently under-utilizing this software — particularly given that we have previously rejected all change requests from the airlines without analysis. When the airlines' change requests are entered into the software system, those requests will prove far less daunting than they appear on the surface. As project manager, I will take full responsibility for the accurate input of change requests into the system and will prepare a comprehensive report for management detailing the projected outcomes. The information technology tools will help the team analyze and control the enterprise environmental factors "that can influence the integrated change control process" ("Part IV: Monitoring and Controlling the Project," n.d., p. 310).

2. Leverage organizational process assets to influence change control. This is why I am recommending that, rather than rejecting change requests outright, we handle them in a systematic manner. If we continue to ignore these requests and later discover that one of them involved a safety measure our team was unaware of, BAE will bear responsibility for any adverse outcomes. I strongly advise management to absorb and process the change requests. Our information technology infrastructure will assist in this effort: the project management system will estimate any resulting changes to cost structure and handle the necessary measurements automatically.

3. Create a formal change request board. We have the personnel to establish this body, as team members have already volunteered to participate. "The project management team can also use the experts on the change control board to evaluate change requests and to make approval or rejection decisions about change requests" ("Part IV: Monitoring and Controlling the Project," n.d., p. 310). Evaluation of each change request will be followed by either outright rejection or structured implementation. This board will formalize what has previously been an ad hoc — and ultimately untenable — process. Establishing clear project governance through a change control board is recognized best practice in the field and will lend BAE greater accountability and transparency with its stakeholders.

1 locked section · 55 words
Sign up to read the full analysis
Expected Results55 words
Systematically engaging with airline change requests is projected to yield three key benefits. First, communication between BAE and its stakeholders will improve, yielding goodwill…
Read the full paper →
Plus 130,000+ examples & all writing tools

References

"BPR-Bechtel." Retrieved from:

"Part IV: Monitoring and Controlling the Project." (n.d.), p. 310.

Key Concepts in This Paper
Change Control Baggage Handling System Stakeholder Management Change Control Board Integrated Change Control Organizational Process Assets Project Management Software Corrective Action Workflow Optimization Risk Management