Project Management Activities Project Planning We Have Essay

Project Management Activities Project Planning

We have to design a schoolhouse that can facilitate 120 people at a time. For this purpose Professional Military Education contact Mr. Thompson to do preliminary research to fulfill the requirements and according to him enough square footage is require to make a complete renovation. The organization I chose is the Professional Military Education Center (EPME). By comparison, this would be considered small company whose purpose is to train enlisted Air Force members to become combat leader and first line managers. I have been working here for about 3 years as the Director of Education. Along with me is the commandant, Chief Murphy, who has been in charge for about 4 years. Next, there are 2 resource advisors, MSgt Copple and TSgt Bolden. Finally, the rest of the staff is made up of 10 instructors, all Tech Sergeants, with various specialties. Everyone is fully qualified to teach the PME curriculum regardless of their position and all of them have a good understanding of the requirements. The classes typically have 14 to 16 students and run every 6 weeks with 1 week off to prepare and transition to the next class. Finally, the civil engineer squadron supported us with Mr. Ben Thompson who had a background in drafting and contract management. Now that we have a better understanding of who is involved, let's talk about the conditions that were causing some of the problems.If we generally see the steps involved in a successful project are:

The objective of schoolhouse project is based on a set of concrete and realistic objectives.

It is based on teamwork, the time management of project planning should be accurate and the coherence of plan should be linked in such a way that it is effective for students.

We can say that schoolhouse design project is a communication tool as it reflects the exchange of education and services of Air Force members.

Objective of the Project

To design a plan of action that defines the activities to be done to achieved the objective of Professional Military...

...

According to the background of this study, among the main challenges are to provide an effective school building renovation program, by providing effective and learning environment to the students.
From the economic side, you have to redirect funds, in the legal part, which is the review of the Teaching Profession Act and the General Law of Education, and the technique, which is the viability. Added to the challenges the review of roles and profiles key players, review of additional time bonus for the schoolhouse, the use of information in investment decisions and make the initiative into a national project (Hansen, 2008).

The EPME has estimated that half of schools under the project will nuclearization, which requires in its pilot phase $10.8 million, of which $7.8 billion for infrastructure.

In sum, the larger the space, with a little over $5 million, of these, $3.7 billion for infrastructure and $722.200 for food, the two items to allocate more funding.

Part 3: Project Control

The schoolhouse currently occupies a 1950s era warehouse building on the AFB. There are 7 classrooms, 7 offices, 2 bathrooms, 1 auditorium, 1 break room, 1 snack bar, and 1 storage room. The building has gone under several partial renovations that, over time, created more issues than they solved. In this project we plan to accommodate over 120 people when class is in session.

Tracking the results of the organization of occupational safety in the school is conducted in accordance with the Plan Production Control,…

Sources Used in Documents:

References

Hansen, Shirley J. (2008). Schoolhouse in the Red: A Guidebook for Cutting Our Losses: Powerful Recommendations for Improving America's School Facilities. Arlington, Virginia: American Association of School Administrators. ED 347697.

Lewis, Anne, et al. (2010). Wolves at the Schoolhouse Door: An Investigation of the Condition of Public School Buildings. Washington, DC: Education Writers Association. ED 306660.

Rowledge, L.R., Barton, R.S., & Brady, K.S. (2009). Mapping the Journey: Case Studies in Statregy and Action Toward Sustainable Development. Sheffield: Greenleaf Publishing.


Cite this Document:

"Project Management Activities Project Planning We Have" (2011, April 17) Retrieved April 19, 2024, from
https://www.paperdue.com/essay/project-management-activities-project-planning-50533

"Project Management Activities Project Planning We Have" 17 April 2011. Web.19 April. 2024. <
https://www.paperdue.com/essay/project-management-activities-project-planning-50533>

"Project Management Activities Project Planning We Have", 17 April 2011, Accessed.19 April. 2024,
https://www.paperdue.com/essay/project-management-activities-project-planning-50533

Related Documents

Project Management Your company planning construct a nuclear power plant Oregon. What is a project life cycle, and how does it support project success? Ensure you define the basic stages of a project life cycle and the primary activities that take place. According to Bin and Heiser (2004) project life cycle refers to the stages a project goes through from the beginning till it is completed. The project life cycle will indicate how a

Venue of the Festival Park is almost rectangular in plan with a side of 1000 meters by 750 meters and is familiarize with the long sides lying GCC SSE. In what direction is to follows N. To S. For convenience. It is situated at grid reference TQ390772. Park stretches along the slope and at two levels. At the lowest level (closest to the museum, the Queen's House, and behind them, the

Project Objectives The program will enable parents to communicate with their child about a crucial health issue -- responsible sexual behavior and HIV / AIDS infection. The program will bring about awareness to both parent and child, as members of the community, about the prevalence of HIV / AIDS infection and other forms of abuses/illnesses linked with it. The program will enable participants to internalize the issue through more specific examples/cases, like those

Program Management Projects Compared - Belbin analysis In order to find a way through which the success of teams could be predicted Dr. Meredith Belbin, a management psychologists, worked in collaboration with Henley Management College in the early 1970s. Business simulations were used in running some experiments for the research by Dr. Meredith Belbin. Participants were divided according to different psychological types such as if they are introvert or extrovert etc.

The strengths of this model are that early iterations of the projects are the least costly and enables the highest risk to be addressed at the least overall cost ensuring upon increase of costs a decrease in risks and secondly that each iteration of the spiral may be custom made to satisfy the needs within the project. Weaknesses in this model are the ambiguous natured milestones, activities performed in

Motivation factors are those that tend to increase motivation when satisfied. Lewis cites company policy as a major hygiene factor; many employees feel oppressed by company policies and are less productive, or even intentionally counterproductive as a result. Most people have at some point had to deal with a company policy that was arbitrary and annoying. It is indeed a major de-motivational factor, but Lewis may be overestimating the