Risk Management In Construction Business Proposal

PAGES
5
WORDS
1493
Cite

Construction Project Proposal for a New Custom-Designed Hillside Home and Patio

Introduction

A construction project proposal for a new custom-designed hillside home and patio that should take 12 months to complete is presented. The overview of the project includes a description of the work to be completed, the location of the project, the timeline for completion, and the staffing requirements. The costs associated with the project are also described, including the costs of materials, labor, and permits. The cost are estimated and the need for flexibility in pricing given due to labor and supply chain constraints for the foreseeable future. Finally, the risks associated with the project are described, including the risks of budget overruns and delays.

Executive Summary

This custom-designed home will be built on a hillside and will include a patio with retaining wall. The total cost of the project is estimated to be $1 million and will take 12 months to complete. The proposal includes a detailed budget and timeline for the project. The architect for the project is John Doe and the construction company is ABC Corporation. The project manager is Jane Smith. The construction crew will consist of 12 workers who will work Monday through Friday from 8am to 5pm. The materials that will be used in the construction of the home are all environmentally-friendly and sustainably sourced. The home will be heated with a geothermal heating system and will have solar panels installed on the roof. The windows in the home will be double-paned to help with energy efficiency. Upon completion, the home will be 3,000 square feet and will have four bedrooms, three bathrooms, a living room, a family room, a kitchen, and a dining room. There will also be a two-car garage and a paved driveway. The exterior of the home will be brick and stone with a shingled roof. The landscaping around the home will include native plants that are drought-tolerant. Water, gas, and electricity are already available at the plot, ready to be tapped into.

Project Goals and Objectives

The three goals of this project are as follows: (1) the first goal of the construction project is to ensure that the foundation is properly laid and that the home is structurally sound; (2) the second goal is to complete the exterior of the home, including installing the solar panels and finishing the landscaping; and (3) the final goal is to complete the interior of the home, paying particular attention to creating a comfortable and inviting living space. With these three goals in mind, the construction team will work diligently to complete the project on time and on budget.

The project objectives are as follows:

To begin, an excavation team will need to clear the hillside lot for the new homes foundations. During this time, the electrician will run underground cables for the solar panel grid and install conduits for the geothermal heating system.

Next, the masons will lay the concrete foundation walls and install footings for supports.

Then, the framing crew will construct the wood frame of the...…for a construction project of this size include excavating equipment, heavy machinery, and trucks. The total cost of the project will vary depending on the specific materials and labor requirements, and pricing flexibility is needed to give an appropriate estimate due to labor and supply chain constraints for the foreseeable future (Blocher et al., 2019).

The overall costs are estimated to be $1 million. However, by carefully planning and budgeting for all of the necessary resources, it is possible to complete the construction of a new custom-designed hillside home within the desired timeline and budget, and an itemized estimate can be given upon request that will include all lumber, plumbing, electric, geothermal and solar materials for the home, as well as all pavers and materials for the patio and retaining wall, plus labor.

Risks

One of the most common risks is the weather. If the project is delayed due to bad weather, this can lead to increased costs as well as delays in the completion date. Another risk is the availability of materials. If the materials needed for the project are not readily available, this can also lead to increased costs and delays. In addition, there is always the possibility that the project will encounter unexpected problems that will need to be addressed, which can also lead to increased costs and delays (Kasapo?lu, 2018). Overall, there are a number of risks that can impact the budget and timelines for a construction project. However, by being aware of these risks, project managers can take…

Sources Used in Documents:

References

Blocher, E. J., Stout, D. E., Juras, P. E., & Smith, S. (2019). Cost Management (AStrategic Emphasis) 8e. McGraw-Hill Education.

Kasapo?lu, E. (2018). Risk management in construction. Sustainable Buildings:Interaction between a Holistic Conceptual Act and Material Properties, 49-71.

Ruben, B. D., & Gigliotti, R. A. (2017). Communication: Sine qua non of organizationalleadership theory and practice. International Journal of Business Communication, 54(1), 12-30.


Cite this Document:

"Risk Management In Construction" (2022, October 20) Retrieved May 8, 2024, from
https://www.paperdue.com/essay/risk-management-construction-business-proposal-2179003

"Risk Management In Construction" 20 October 2022. Web.8 May. 2024. <
https://www.paperdue.com/essay/risk-management-construction-business-proposal-2179003>

"Risk Management In Construction", 20 October 2022, Accessed.8 May. 2024,
https://www.paperdue.com/essay/risk-management-construction-business-proposal-2179003

Related Documents

Risk Management The objective of this study is to discuss the role and nature of organizational risk management in justice and security organizations and why it is so important. The following will be addressed in the assessment; (1) risk planning and resource identification; (2) management of risk in justice and security organizations; (3) costs associated in managing risk; (4) consequences of failing to manage risk; and benefits; and (5) benefits a

Risk Management Applications in Hospitals The concept, usage and learning of risk management phenomenon are important for all institutions in healthcare industry. The most important purpose of risk management in healthcare industry is learning from errors, it is these human errors that pave the way for us to learn prepare and not repeat these errors again. These errors can lead to a medical incident and the learning from them occurs when these

3. The action levels will include all the levels of risk determination and mitigation involved. First, the process would have to be initiated by means of defining potential problems. A risk management team would be brought into being in order to determine the specific risks involved. The quality inspector will lead the team, and be responsible for obtaining data of aircraft using our part. In terms of the teams working on the

Risk Management Integrated Emergency Planning An Emergency Risk Management Plan for a Large Supermarket in the UK Emergency Planning in the UK Risk Identification and Qualification PESTEL Framework Risk Identification Table Risk Qualification Matrix Risk Quantification Disaster Management Plan Situation Mapping of Hazards, Vulnerabilities and Impact Vulnerability Table Loss Estimation Resource Inventory Communication Management Plan Monitoring Plan This emergency management plan has been created for a large independent supermarket chain in the UK. The supermarket is comprised of six locations in total and all of the

The most effective security reporting procedure is to use the OCTAVE-based methodology. The reason why is because, they are utilizing solutions that will address the total nature of the threat in comparison with the others. For any kind of organization, this helps them to understand what kinds of issues that they could be facing and the impact that it will have on the entity itself. At the same time, it

Risk Management in Hedge Funds A research of how dissimilar hedge fund managers identify and achieve risk The most vital lesson in expressions of Hedge Fund Management comes from the inadequate name of this kind of alternative investment that is an alternative: The notion that all methodical risks are differentiated away is not really applicable here, with the Hedge Fund returns, in realism, representing a mixture of superior administration of market