Skills Project Location Of Resources Essay

PAGES
4
WORDS
1238
Cite

The bottom line that out of the many sources of information available on Kuala Lumpur, Malaysia there is a percentage that deserves the most trust and focus, and there is much that can be discarded and not used. In making this judgment the trustworthiness of the information needs to be assessed using the series of sources provided in this analysis (Cho, Jang, 2008). Appendix A, a mind map for planning extended travel provides an overview of the issues related to planning and traveling. Location of Resources

The CIA Factbook (https://www.cia.gov/library/publications/the-world-factbook/index.html) provided an excellent overview of the current cultural, economic, religious, demographic and political landscape of Malaysia in general and Kuala Lumpur specifically. In addition, the CIA Factbook provided insights into how the country is currently experiencing a recession and the political forces at work there that could potentially lead to protests or violence. Malaysia's political risk is well defined in the document Political Risk Yearbook: Malaysia Country Report, 2-24 (Malaysia, 2010) found using EBSCO Host report analysis queries. In addition, the country overview found in EBSCO Host, 2009 Malaysia Country Profile (Malaysia, 2009) also showed how the economic conditions in the country continue to be challenging for the lower middle class and middle class workers there. As the majority of workers are in service industries, an evolving Catch-22 condition is starting to emerge as they need to attract more tourists yet cannot due to the economy slowing down and loans being harder to get for building attractions and hotels. This has put the country on edge, as one of every two workers is in a service-related and often tourist-related job (Malaysia, 2010).

Evaluation of Resources

EBSCO Host and ProQuest both provided useful background materials on the role of travel and tourism data on Malaysia and its position in the hospitality industry (Poon, Low, 2005) (Ing, Liew-Tsonis, Cheuk, Razli, 2010). Of the two however, EBSCO Host was much more effective in defining the...

...

The articles from ProQuest were more academically oriented and showed how the Malaysian hotels at times tend to project inaccurate images of what their value propositions are (Ing, Liew-Tsonis, Cheuk, Razli, 2010) and as a result there is a skewed view of the country as a result (Poon, Low, 2005). The CIA Factbook provided the foundation to put these two different data elements into context. All three are critical for understanding the situation in Kuala Lumpur, Malaysia and what would most likely be the conditions when arriving there.

Sources Used in Documents:

References

Cho, M., and S. Jang. 2008. Information Value Structure for Vacation Travel. Journal of Travel Research 47, no. 1, (August 1): 72.

Ing, G., J. Liew-Tsonis, S. Cheuk, and I. Razli. 2010. An Examination Of The Challenges Involved In Distributing A Strong And Consistent Destination Image In The Marketing Of Tourism In Malaysia. The International Business & Economics Research Journal 9, no. 1, (January 1): 31-39.

Lee, J.. 2009. Mobilizing for Social Change in Muslim Societies Amidst Political Turmoil and Conservatism. Development: Special Issue for the 11th AWID International Forum on 52, no. 2, (June 1): 239-245.

Malaysia: Country Analysis Report. September, 2009 Malaysia Country Profile, 1-80.
Link: http://thoughtwrestling.com/blog/how-make-mind-map/


Cite this Document:

"Skills Project Location Of Resources" (2010, November 04) Retrieved April 18, 2024, from
https://www.paperdue.com/essay/skills-project-location-of-resources-7122

"Skills Project Location Of Resources" 04 November 2010. Web.18 April. 2024. <
https://www.paperdue.com/essay/skills-project-location-of-resources-7122>

"Skills Project Location Of Resources", 04 November 2010, Accessed.18 April. 2024,
https://www.paperdue.com/essay/skills-project-location-of-resources-7122

Related Documents

ABI Inform was also very useful when queried on the topic of small business models and small business planning documents. It also had documents and dissertations on small business failure rates and empirically derived studies explaining the factors behind this occurring (Justis, Chan, 1993). ABI Inform also did not have coverage of the legal issues facing entrepreneurs in Australia, yet did have coverage of shared risk mitigation through global

Project Project No. Product name Product status Inspection result Reviewed by ____ Project Manager Signed ____ Date Approved by ____ Sponsor Signed ____Date Accepted by ____ Client Signed ____Date 29 -- QA Audit Form - Purchasing Goods And Services Activity Responsibility Findings Comments / Remarks ( x Scope of Work determined. Costs estimated. Verify whether local supply of required product or service has been checked. Funds available. Purchasing documents reviewed prior to issue Delivered goods inspected 30 -- Team Survey Issue Yes Maybe No Suggestion Team members are respected and trusted Team efforts are recognised and rewarded Team members are open

Project Failure
PAGES 5 WORDS 1515

Project management is an important component in the success of projects undertaken by modern business organizations or enterprises. Organizations embark on project management initiatives to help promote the success and effectiveness of their various projects. However, organizations across the globe face substantial project failure rates, which are often costly since they waste millions of dollars in the process. Given the likelihood of project failures, organizations undertake several measures to help

Project Management: Case Study in Managing a Complex Shipyard Project in Singapore Background of Complex Shipyard Construction Project Company background Project Overview and Objective Work Process of Building Construction Issue Analysis in Shipyard Construction Project Management Literature Review of Project Management Issues in Scope Management Methodology of Scope Management Lessons Learned from Scope Management Issues in Cost Management Methodology of Cost Management Lessons Learned from Cost Management Issues in Human Resources Methodology of HR Management Lessons Learned from Human Resource Management Case Study in Managing a

Projected Labor Shortages: Build a Bear Workshop Current workplace The workplace I chose to study is Build-a-Bear. Build-a-Bear has its headquarters in St. Louis, Missouri. It has locations all over the world, and operates those locations in two manners. The stores in North America, the United Kingdom, Ireland, and France are owned by the company. The stores in other international locations, including Australia, Belgium, Denmark, Germany, Japan, The Netherlands, Norway, South Korea,

Project Management Emerging markets continue to be a promising area for many of America's most beloved companies such as Coca-Cola, Apple and more. This bodes well for project managers in the digital age as the expand operations overseas. However, as these companies become more global, the risk associated with their operation becomes more important. Understanding gender, ethnic and cultural differences can have a profound impact on the overall success of a