SOW Cost Estimate Statement of Work

[Date published]

[Presenter's name]

Time and materials

Client's administrator

Relocation of Office Headquarter

Engagement duration

Begin date

Feb' 2012

End date

Feb' 2012

Schedule of rates [Include fixed-rate costs for items such as equipment and hourly rates for employee time and service.]

Item description

Delivery schedule

(Business days)

Cost

(estimate)

desks (with associated chairs)

day- 1st Feb 2012

day- 1st Feb 2012

Coffee Tables

day- 2nd Feb 2012

Armchairs

Small Items (120 X 160 boxes)

Frames

day 3rd Feb 2012

Computers (with monitors)

day- 1st Feb 2012

Payment terms

Phase

Completion date

Payments due

Phase 1 -- Movement of Furniture and Computers

2nd Feb 2012

$965

Phase 2 -- Movement of Frames and Small Items

3rd Feb 2012

$350

Phase 3- Cleaning, Organizing and Arranging relocated items at new premesis

4th Feb 2012

$100

Statement of work

Assumptions

Following assumptions are to be made for the project.

All costs include packaging costs, labor wage rates, vehicle rent and fuel rent.

The client will provide all the items that are to be relocated to the new site.

...

are part of contractors responsibility and the due amount has been made part of the payment.
All labour costs are calculated using the formula (labour wage rate X no. Of labour hours).

All freight costs are calculated using the formula (price of fuel per litre X distance travelled by the vehicle in a litre X total distance travelled by the car).

All packaging costs are calculated using the formula (cost of material X no of wraps).

The client will not be responsible to pay for extra labour hours if the labour fails to complete the task within the stated time schedule.

All costs shown in the rate schedule are Total Costs.

Change management process

The contractor will be held responsible for any breakage, loss or damage caused to any item whatsoever, due to whatever reason.

In the event of loss or damage of any item, the contractor will be liable to pay the client the due amount of loss as compensation.

If work cannot be carried out on any given day due to unforeseen circumstances such as a public holiday or a natural disaster, work shall resume from the next closest day available to start work and will follow the same schedule and costs as stated above.

All labor wage rates are pre-determined and client will not make cost adjustments to any wage rate increases to the contractor after the signing of the contract.

The client shall make adjustments to freight costs in the event if the state increases the fuel costs after signing of the contract…

Sources Used in Documents:

Full name

3/2/2012 Statement of Work Page 2

3/2/2012 Statement of Work Page 5


Cite this Document:

"Sow Cost Estimate Statement Of Work Date" (2012, March 02) Retrieved April 24, 2024, from
https://www.paperdue.com/essay/sow-cost-estimate-statement-of-work-date-78359

"Sow Cost Estimate Statement Of Work Date" 02 March 2012. Web.24 April. 2024. <
https://www.paperdue.com/essay/sow-cost-estimate-statement-of-work-date-78359>

"Sow Cost Estimate Statement Of Work Date", 02 March 2012, Accessed.24 April. 2024,
https://www.paperdue.com/essay/sow-cost-estimate-statement-of-work-date-78359

Related Documents
The Scope of Work
PAGES 4 WORDS 1809

Contracting Case Study A contractor (C) contracted with owner (O) to build a 30,000 SF of 5-story pipe rack and piping with a very simple changes clause allowing, "changes within the general scope of the work." Must C perform an order to do any of the following? Explain why, and if performed, how should the price be determined. Scope of Work Overview The Scope of Work (SOW) is the area in an agreement

Failure to complete a contract in the required time will allow the Provider to forfeit any further contracting potential for a period of at least one year from the signing date of the contract. 10.4 Penalties and Bonuses No penalties or bonuses will apply to this project 11. LICENSES, PERMITS & INSURANCE The Provider will carry at least $1 million dollars in general insurance to cover their equipment, personnel, and any damage to the facility

IT Project Management PROJECT CHARTER Objective of this project is to upgrade the new computer system for the ACME Incorporation. The company has decided to launch the 200 desktop computers to enhance organization efficiencies. The company will also take the advantage of the new system to integrated effective security systems, which will include: Account lockout policy (SANS CSC 16-9), Password policy (SANS CSC 16-8), and Screen Lock Policy (SANS CSC 16-6). Integrated of effective security

S. Air Force. During the heyday of defense contracting in the 1950s and 1960s, it became apparent to the Defense Department that as projects get larger and more complex, it becomes increasingly difficult to track what is happening on them. This problem is compounded by the fact that these large projects are being carried out in multiple contractor organizations, each of which employs its own peculiar planning and control system

General Dynamics employed WBS to connect their Integrated Product Teams, known as Design Build Teams -- DBTs having the established design goals. Hence every DBT possess a particular design goal allocated by management. The WBS is planned to wholly describe everything inside the program. A WBS defines the product(s) to be developed or produced and connects the constituents of work to be attained mutually and to the final product. Hence

Other protests presented by CIS included unfair evaluation of OTG - another presenting company. Complaints here included vague requirements; insufficient detail as to why they rejected proposal; apparent duplicity (as in the case of implying that three of its present employees were available for position); and ambiguous and vague language in its blanket statements. The decision was that the agency misevaluated the proposal of CIS as well as that of OTG,