Term Paper Undergraduate 495 words Human Written

Two Processes

Last reviewed: ~3 min read Business › System Architecture
80% visible
Read full paper →
Paper Overview

¶ … Megaprojects First Process The first process that will be discussed is the digital design technology to support, construction, integration, and maintenance activities. The technologies used in this phase operated on two levels. On one level, they addressed the co-ordination of design, construction and integration, while on a different...

Full Paper Example 495 words · 80% shown · Sign up to read all

¶ … Megaprojects First Process The first process that will be discussed is the digital design technology to support, construction, integration, and maintenance activities. The technologies used in this phase operated on two levels. On one level, they addressed the co-ordination of design, construction and integration, while on a different level, the technology was used for the virtual testing of different components and systems.

The single model environment (SME) that was used in this case was aim to help overcome several important challenges, primarily the need to be able to exchange information in real time. At the same time, the SME would permit a more realistic understanding of the design, with additional simulations that applied to overcoming this challenge. One of the challenges that SME approached was digital vertical integration.

The idea of digital vertical integration is in line with what has been previously discussed in the previous paragraphs: in a construction project of the size and importance of the Heathrow Terminal, it became essential to have all actors cooperate actively on the given design. Besides the fact that information needed to flow between these actors, accessibility was also an important challenge. One challenge that remains in this phase in terms of moving the project into operations is the implementation of knowledge in the organization.

Applying technology in the design phase through SME appears to solve several of the communication and cooperation challenges of the project, but implementing the SME requires the implementation of knowledge, namely it requires people to be able to use the technology and understand how to operate it to its most efficient way.

Second Process While Just in Time logistics is an effective way to deal with the logistics part of the project, all bodies involved need to be well-acquainted with the exact strategies they need to employ in order to know when it is important for them to perform the next step in the program. Having materials and components lying around is not beneficial for the enterprise as a whole just as not having these materials when they are needed can bring on further issues.

By using ProjectFlow, individuals in the projects can have a complex understanding of their mission in general and can thus take efficient decisions when this is needed. The application provides users with the power to coordinate everything in the project ranging from what teams work in.

99 words remaining — Conclusions

You're 80% through this paper

The remaining sections cover Conclusions. Subscribe for $1 to unlock the full paper, plus 130,000+ paper examples and the PaperDue AI writing assistant — all included.

$1 full access trial
130,000+ paper examples AI writing assistant included Citation generator Cancel anytime
Sources Used in This Paper
source cited in this paper
3 sources cited in this paper
Sign up to view the full reference list — includes live links and archived copies where available.
Cite This Paper
"Two Processes" (2014, May 28) Retrieved April 21, 2026, from
https://www.paperdue.com/essay/two-processes-189501

Always verify citation format against your institution's current style guide.

80% of this paper shown 99 words remaining