Project Management: Lessons Learned From Project Plans in the New World
The article Project Plans in the New World (osenwinkel (1995) provides many useful insights into how to manage a complex project successfully, taking into account the many factors or variables that are crucial for a project's success. The author concentrates on the "Free Wheeler" type of project leader who often ignores constraints of time, cost and resources in determining how to successfully manage a complex project to completion (osenwinkel, 1995). Comparing this article to experiences launching new products, followed by an interpretation of two "people" and "project" variables, and a summary of how a project's direction and scope would need to be modified based on lessons learned from osenwinkel (1995) are presented in this paper.
Analysis of Project Plans in the New World
The pragmatic tone of the article indicates the author has experiences many projects that have been…
References
Chaney, P.K., Devinney, T.M., & Winer, R.S. (1991). The impact of new product introductions on the market value. The Journal of Business, 64(4), 573.
Rosenwinkel, J. (1995). Project plans in the new world. Journal of Systems Management, 46(2), 34.
EP Project Plan
Objective of this project is to present the project plan for the Enterprises esources Planning (EP). The whole project plan will span for approximately 18 months. The project will start on the 4 June 2012 and end by 30 December 2013. Each of the major phases of the project is broken down in-between 8 and 10 sub-processes. The study uses Microsoft project to complete the plan and the GANTT chart. "The basic purpose of a GANTT Chart is to break a large project into a series of smaller tasks in an organized way. The chart shows when each task should begin and how long it should take." (University of Michigan, 2002 P. 1). The Fig 1 provides the Gantt chart and the project plan and time-frame to complete each process. Overall Project plan is as follows:
Detailed EP Project Plan
Project Management and Selection Process.
: User…
Resources Planning
Reference
University of Michigan (2002). ME450: Gantt Chart Handout. USA.
Power Project Plan make a microeconomic analysis automobile industry. Project: Will Power price According resources availed countries, explicate price variation products services relation automobile industry special reference car industry.
Power Project Plan
Price in the automobile industry
In most products and services, variations in demand are indirectly correlated with variations in price, and vice versa. For instance, in the scenario of an increasing demand for the product X, it is expected that the same product supply be less able to serve the entire need. In order to regulate the demand then, the product would be retailed at a higher price. Vice versa, when the demand for an item decreases, it is expected that its retail price suffers a reduction in order to stimulate the demand.
Within the automobile industry, prices play an essential role in shaping the demand for the automobiles and the adherent accessories and services. And the most…
References:
2006, Why Toyota is better than Ford, Economist's View, http://economistsview.typepad.com/economistsview/2006/02/why_toyota_is_b.html last accessed on April 13, 2011
2008, Declining sales rock auto industry, CBS News, http://www.cbsnews.com/stories/2008/07/01/business/main4224296.shtml last accessed on April 13, 2011
CRM Project Plan
CustomerSuccess2015
Project Description
Connecting with and keeping customers buying over the long-term is essential for any business to grow over time. One of the most cost-effective and efficient approaches to galvanizing a company around its customers is to use a CRM system (Banerjea, 2011). Cloud-based CRM systems are adept at quickly being deployed across any size organization, providing a more unified view of the customer and greater insights into overall purchasing activity (Harding, Cheifetz, DeAngelo, Ziegler, 2004). The CustomerSuccess2015 project is designed to enable our company to better attract, sell and serve our customers.
Business Justification
The following is from the Project Justification, which shows the costs and benefits of the project:
With a total cost of $90,000 and a monthly subscription fee of $10,000 for all components including integration and security services, the costs of the planned CRM implementation need to be compared with the potential…
MacVille Villiano Coffee Project Plan
Final Project Overview
Overall, the project has been a success. Despite a few mishaps and lessons learned, the venue was a hit and the budget was satisfactory enough to pull off a great marketing campaign for the event and the brand. With the whole team working together, it was a successful event.
Still, there were some clear issues that could have been worked out better before the event took place. For one, the choices of the venue was sufficient, but could have been more cost effective and have provided a more pleasurable ambiance for the event. The venue that was chosen for the event was at the South Australian Maritime Museum. This venue offered a great location, close to modern development and amenities. Yet, in hindsight, the Greenway Art Gallery might have been a better choice. The South Australian Maritime Museum was the costlier of…
Motorcycles -- The Comprehensive Project Plan 1.Describe project scope project management plan. Align plan strategy recommended senior executives Assignment 2. 2.Analyze type staff company order make manufacturing switch motorcycles larger motors.
Project Scope
The scope of the project is to switch the manufacturing process to larger motors motorcycles. This is an important strategic decision that affects not only the future of the company, but also its current situation. Switching to manufacturing motorcycles of larger motors requires significant investments. It is likely that the company should reallocate certain funds from other activities to this project. Therefore, it is important to carefully develop the project plan so that the investment is made efficiently and risks are reduced to the minimum.
Project Management Plan
Project management approach
The authority and responsibility for managing and executing this project belongs to the project manager. The project manager is in charge of the project team that…
Reference list:
1. Schreiner, E. (2015). Seven Strategies for Developing Cohesive Teams. Hearst Newspapers. Retrieved February 27, 2015 from http://smallbusiness.chron.com/seven-strategies-developing-cohesive-teams-17354.html .
2. Rayl, J. (2013). Strategies in Team Building. Retrieved February 27, 2015 from http://acb.org/node/1287 .
3. Baker, D. (2015). Top 10 Characteristics of Great Project Managers. Retrieved February 27, 2015 from http://99u.com/articles/6946/top-10-characteristics-of-great-project-managers .
Middleweight motorcycles
Coffee Launch Event
Stakeholders
Stakeholder
Stakeholder Group
Interest in Project
MacVille Adelaide
Project Management Committee
Adams and Elizabeth
Barista Champion
ichmond Hotel
Competition winner
Venue for Marketing and promotion of the Project
Adelaide City, South Australia
Create awareness and boost up sales
Project Management Team
MacVille Adelaide
Smith
Marketing Management Team
MacVille Adelaide
Business promotion and advertisement designing team
Marketing Department
Coffee segment (MacVille Villiano brand)
Communication and promotion
Coffee etailers
Minimum 300 in the Adelaide City
Distribution
Project Tasks
Conduct preliminary analysis:
Find a location that best suits the nature of this business segment, e.g. low competition, pleasant atmosphere, nearby developed areas, etc.
b. Book the place and make initial payment
Book flight (in Pacific Airlines) and accommodation (in ichmond Hotel) for Barista Champion iii. Locate and contact minimum 300 retailers in Adelaide City, South Australia that can become a potential value chain member for this coffee brand.
iv.…
References
Google Maps, Distance and directions for Greenaway Art Gallery from Adelaide International Airport.
Google Maps, Distance and directions for South Australian Maritime Museum from Adelaide Town Hall.
Meredith, J.R. & Mantel, S.J. (2012). Project Management: A Managerial Approach, 8th Edition. Hoboken, NJ: Wiley
Paws Veterinary Hospital
Pets Hospital
Betoull Dashti 16108
Sara Al Hindi 20088
The 3,000,000 KD capital input in the business will be used to buy the necessary equipment so that the organization can provide the service to its market target. This money will be used to buy drugs, insurance, cleaning gadgets and even pay for the insurance that will cover the business. About thirty percent of the capital will be used in buying the products and offering the services; equivalent to 1,000,000 KD. Another 1/8 of 2,000,000 will be set aside for training purposes to ensure that all staff members are aware of what their customers expect to receive from the hospital.
The 250,000 KD will also be used to buy a uniform for the staff members to help their customers identify relevant personnel to ask questions if the need arises. Uniformity in the organization will also help the management…
Resources
Managers should look into opening new avenues that will promote their marketing tactics
Health Promotion for End-Stage Dementia
End-Stage Dementia Care
Health Promotion Plan for End-Stage Dementia
Health Promotion Plan for End-Stage Dementia
Globally, an estimated 35.6 million adults are living with dementia, a number expected to double by 2030 and triple by 2050 (World Health Organization, 2014). Most patients with dementia in the United States will die in a nursing home (reviewed by Goodman et al., 2010), which means that these patients sometimes live for years within these institutions. The level of dementia care required can sometimes be quite high as the ability for self-care and effective communication is lost (Puurveen, n.d.). These facts and statistics explain why an estimated $157 to $215 billion is spent each year on dementia care in the U.S. And why there is a need for cost effective and humane dementia care globally; however, some care professionals have questioned the efficacy of the traditional medical model and…
References
Brownie, S. & Nancarrow, S. (2013). Effects of person-centered care on residents and staff in aged-care facilities: A systematic review. Clinical Interventions in Aging, 8, 1-10.
Barbosa, A., Sousa, L., Nolan, M., & Figueiredo, D. (2014). Effects of person-centered care approaches to dementia care on staff: A systematic review. American Journal of Alzheimer's Disease & Other Dementias, published online ahead of print 20 Jan. 2014, doi: 10.1177/1533317513520213.
Department of Health, Australian Government. (n.d.). About the Community Health Action Pack. Retrieved 13 Feb. 2014 from http://livelonger.health.gov.au/about-the-community-health-action-pack/.
Goodman, C., Evans, C., Wilcock, J., Froggatt, K., Drennan, V., Sampson, E., Blanchard, M., Bissett, M., & Iliffe, S. (2010). End of life care for the community dwelling older people with dementia: An integrated review. International Journal of Geriatric Psychiatry, 25, 329-37.
video is very shocking because it basically exposes how law enforcement officers will use duress or "wear down" a suspect and provide that suspect with details of a crime so that the suspect can later "confess" in detail about the crime that he/she committed -- when in actuality the story was essentially fed to the suspect by the officers who think (or not) that they have found the guilty party and just need to coerce him (over a number of hours -- not recorded on videotape) using whatever tactics they deem necessary (the judge and jury never see these tactics because they are not recorded but it may be surmised that they border on torture, which should invalidate any confession then and there). What is most infuriating is that these officers essentially act as judge and jury themselves in that they determine the guilt of their suspect and then "get…
References
False Confessions or Admissions. (n.d.) Innocence Project. Retrieved from http://www.innocenceproject.org/causes-wrongful-conviction/false-confessions-or-admissions
The use of Gantt charts for enabling interprocess integration and knowledge management in the A&D industry is a best practice for also managing process-intensive projects (Singh, Keil, Kasi, 2009). These include the development of new computer systems and advanced technologies where the project needs to capture the knowledge to fulfill its objectives. Project management's core set of tools therefore needs to be focused on how to augment and strengthen project performance while also capturing process and product knowledge critical to its success (Besner, Hobbs, 2006). The combining of Gantt charts, progress reports, change requests and the use of kick-off meetings to set objectives is critical in this regard.
ecommendations to Project Managers Using the Product Launch Activity Plan
The pro-forma Product Launch Activity Plan shown in Table 1 of the Appendix is designed to provide project managers with a framework to define a Gantt chart to manage the new product…
References
Claude Besner, & Brian Hobbs. (2006). THE PERCEIVED VALUE AND POTENTIAL CONTRIBUTION OF PROJECT Management PRACTICES TO PROJECT SUCCESS. Project Management Journal, 37(3), 37-48.
Saumya Bhattacharya. (2009, August). Creating a project plan: The secret sauce of a project is in its planning.. Business Today.
Blackstone, J., Cox, J., & Schleier, J.. (2009). A tutorial on project management from a theory of constraints perspective. International Journal of Production Research, 47(24), 7029.
Michael Burkett. (2005, July). The "Perfect" Product Launch. Supply Chain Management Review, 9(5), 12-13.
Project schedule and risk management are some of the most important components of project management. These components play a crucial role in project planning, which is a process used to organize various areas of a project such as workloads and management of the project team. Project schedule basically refers to a listing of the activities or tasks, milestones, and deliverables of a project that includes the expected start and finish dates ("Project Scheduling," n.d.). isk management is a process through which a project manager and team predicts risks, estimates impacts of these risks on the project, and describe reactions to these issues. This process usually involves the preparation of a risk management plan or outline in order to accomplish these goals.
Definition of What Needs to be Done:
One of the most important aspects to consider when developing a project schedule is all the work that needs to be completed.…
References:
Harris, S. (n.d.). How to Implement An Effective Risk Management Team. Retrieved January 23,
2014, from http://searchsecurity.techtarget.com/tip/How-to-implement-an-effective-risk-management-team
"Project Schedule Development." (n.d.). Mind Tools -- Essential Skills for An Excellent Career.
Retrieved January 23, 2014, from http://www.mindtools.com/pages/article/newPPM_71.htm
.....project management approach is increasingly becoming popular in today's workplace. Organisations are ever more recognising the benefits of accomplishing tasks and activities as projects -- better task coordination, quicker task execution, and so on (Larson et al., 2013). The author's organisation, a renewable energy firm with operations in Australia and beyond, has particularly been shifting to the project management approach in recent years. The organisation is currently interested in acquiring or merging with a suitable rival to improve its market share and competitive advantage. The merger or acquisition process is often not an easy undertaking. It requires proper planning and execution. With the application of project management concepts, however, the process can be easier. This report analyses the relevance of various project management concepts to the merger or acquisition process. Attention is particularly paid to the project environment, project definition, time and cost estimation, project plan, risk management, resource scheduling,…
Project isk Management
isks associated with projects successful completion
A project is an undertaking of human beings towards satisfying world needs. Projects are endeavors with a defined beginning and an end. Projects suffer from scope, time, cost and quality constraints. It is necessary for project managers to manage the risk of developing weak scope. Scope of a project incorporates the objectives of a project, the target population, the output and impact of that endeavor. Therefore, managers of project need to do a problem analysis, stakeholder analysis, environment analysis to know if the project is sustainable (Cleland & King, 1988). On the risk of time, managers need skills on time management. Management of projects requires one to be well versed in developing schedules. Time management involves developing systems that has a specific time of completion and start time.
Scheduling of projects includes hiring of individuals for the accomplishment of projects. There…
References
King, W.R. (Eds.) & Cleland, D.I., & (1988). Project management handbook (Vol. 2). New
York: Van Nostrand Reinhold.
Anbari, F. T & Kwak, Y.H., (2009). Analyzing project management research: Perspectives from top management journals. International Journal of Project Management, 27(5),
435-446.
Project Management Techniques:
Signatures Inc. is a company that focuses on manufacturing personalized products like coffee mugs and pens with company logos. The firm generates over $40 million in annual revenues with a workforce of more than 300 workers. Since the company is in the middle of a large multimillion-dollar SCM implementation, it has hired a project management outsourcing company to take charge of its project management efforts. The decision to outsource its project management initiatives is based on the challenges it has experienced in middle of this costly implementation process. Actually, Signatures' implementation of the expensive SCM project has been failing because of three major reasons. The three reasons are the use of traditional waterfall methodology, failure to follow SDLC and skipping the testing phase, and the development of the project plan during the analysis stage, which was never followed or updated by the old project manager. Therefore, the…
References:
Fisher, A. (2013, November 22). 4 Steps to Turning around a Troubled Project. CNN Money.
Retrieved December 23, 2013, from http://management.fortune.cnn.com/2013/11/22/4-steps-to-turning-around-a-troubled-project/
Symonds, M. (2013). Project Management: One Size Does Not Fit All. Retrieved December 23,
2013, from http://www.techrepublic.com/blog/it-consultant/project-management-one-size-does-not-fit-all/
It is essential to determine the critical path and shortest and long paths based on the allocated time.
The network diagram for the wedding planning project also provides an understanding about the activities in the sequence they are required to be performed. It is observed that family task is preceded with invitations Lists and on the basis of this activity invitations are posted. The booking of the ceremony is also completed after this activity. On the other hand the wedding activity has two preceding activities including place finalizations and dress selection and rings, which is followed by the floral and decor as well as honeymoon. The finalization of place leads to appointment for ceremony and venue selection, leading towards the final weeding as finish of the activities.
Family
I
nvitations List
edding
Finish
Venue Selection
Appointment
for Ceremony
Finalization of Place
Invitations Postage
Dresses and Rings
Start
Honey Moon
Floral…
Works Cited:
Rosenau, Milton D., and Gregory D. Githens. Successful project management: a step-by-step approach with practical examples. Wiley, 2011. Print.
Schwalbe, Kathy. Information Technology: Project Management. Course Technology Ptr, 2010. Print.
Project Management
Project Libra: To Terminate or Not to Terminate
Visit www.itweek.co.uk/News/11329438 to see the string of news stories related to Project Libra. Identify some of the sources of the problems the project faces.
Project Libra exemplifies several attributes of failed projects the most notable of which is the breakdown in project team, Fujitsu Services (ICL) system integrator and enterprise software vendors. Most evident of a filed project management structure is the ballooning size of payments made during the project with literally nothing to show for it.
These are the most significant lessons learned from the failure of Project Libra. First, the British government should have had a series of measurable goals and objectives in place first and required monthly updates on project status and delays. This would have drastically reduced the confusion over just what the status of the project was, as is evident from background readings on this…
References
Frame, J.D. (2008). Reinventing project management: The diamond approach to successful growth and innovation. Project Management Journal, 39(1), 96-96.
Gardner, D.J. (2000). How to avoid IT project failures. Consulting to Management, 11(1), 21-23.
Sutterfield, J.S., Friday-Stroud, S., & Shivers-Blackwell, S. (2006). A case study of project and stakeholder management failures: Lessons learned. Project Management Journal, 37(5), 26-35.
Tsoukakas, J. (2001). Stop IT project failures through risk management. Interfaces, 31(6), 133-135.
The reasons for optimization of the project plan are to save time, to save money and to save in over-allocation of human resources to the project. Management of people, processes, and performance is critical in project management success. According to the work entitled: Integrated Project Management Optimization:
"In this case the decision space is confined by the restricted human capacity and the candidate architectural solutions. The well-known limits are the development capacity, the available cost, the required quality, the dependability etc. The real task is to find the optimal scheduling of the work to keep the given time limits, or to realize the optimal allocation of the human capacity to reduce the cost of the project. Our aim is to trace this problem back to combinatorial optimization." (Doban, 2005)
The following illustration demonstrates the different aspects of project management that must be considered by the project manager:
Source: Project Management…
References
Archibald, Russesll D. (2004) Part 2: Project Management Applications, Practices and Tools - Project Management State of the Art 2004. Online available at: http://www.maxwideman.com/guests/stateofart/organizations.htm .
Difficulties and Constraints (2005) Online available at: http://72.14.203.104/search?q=cache:9RT40y-GtyMJ:www.worldbank.org/transport/rural_tr/imp_docs/rri_n2a.pdf+Project+Management:+Constraints+within+the+Environment+& hl=en
Doban, Orsolya, et al. (2005) Integrated Project Management Optimization. Online available at: http://64.233.167.104/search?q=cache:2sju3u1ttKIJ:www.mit.bme .hu/ev ents/minisy2001/Minisymp2001-Cikkek/doban.pdf+Project+ Manag ement+Optimization& hl=en.
McGannon, Bob (2002) "Corporate Culture: A Constraint On Your Project?" ESI International. Online available at: http://www.esi-international.com/public/publicat ions/82002corporatemanagementculture.asp.
From such goal, problems can be avoided within the process of building the house. Moreover, with the help of the process of identifying the needs first before going into the process of house construction, the course of building the house can be properly managed.
In general, within the main goal of developing a good project management practice is the goal of identifying the important procedures that must be considered to complete the main goal. Following are some of the important subordinate objectives.
To have the skill and practice of identifying important requirements for a project
To have the skill and practice of organizing a project plan before starting the process of project development.
To have the skill and practice of following a systematic process of project development.
Schedule and WS
uilding a Home
Description:
Implementing a good project management in planning and building a home.
Input: Identified requirements for building…
Bibliography
Demonstration of Feasibility and Use of Report.
Retrieved on Feb. 01, 2005, from ITI.ESA Online.
Web site: https://iti.esa.int/iti/resource/ITI_proposal_b_example.pdf.
Getting Started, Building a Custom Home.
Project Management
Scope Management
Small LAN's Inc. installed a Local Area Network at the new Spring Academy Childcare Center. The project came in a few weeks late becaue of a failure in the planning procees and the overall partner's communications. "In directing the intent of the project, the plan must clearly identify the project objectives, goals, and any special influences or constraints on the project scope." (Stuckenbruck, 100) In order to compete in the twenty first century, Small LAN's Inc. turned in a rather low bid to acquire this work and with today's tighter corporate budgets and reduced resources, Spring Academy Childcare Center accepted.
For this particular project, the project scope consisted of Small LAN's Inc. taking the lead in purchasing all necessary equipment and then professionally installing an entire network over the course of twenty three days. The project had a start date of May 17, 2002. The deadline…
Works Cited
Deal, Terrence E., and Allan A. Kennedy. The New Corporate Cultures: Revitalizing the Workplace After Downsizing, Mergers, and Reengineering. Cambridge, MA: Perseus Publishing, 1999.
Kennedy, Allan A. The End of Shareholder Value: Corporations at the Crossroads. Cambridge, MA: Perseus Books, 2000.
Madu, Christian N. Management of New Technologies for Global Competitiveness. Westport: Quorum Books, 1993.
Stuckenbruck, Linn C. The Implementation of Project Management: The Professional's Handbook. Reading: Addison-Wesley Publishing Company, 1981.
Project Management
The part one of this project discusses several challenges that can affect the success of a project. Ineffective project management and inefficient project planning are part of the top challenges of project implementation, which consequently lead to project failures if these challenges are not effectively managed. In the contemporary project environment, one of the major challenges facing project implementation is the project's risks, typically, every project carries risks and bigger projects carry more risks than smaller projects. Understanding the strategy to manage the project risks is very crucial in delivering a project that meets stakeholder's goals and objectives (PMIS, 2013). isks are uncertain events that can cause negative effects to a project. However, it is the responsibility of the project manager to identify potential risks before the project starts, the risks such as change in project requirement or equipment malfunction can be identified before the project start, however,…
Reference
Field, M., & Keller, L. (2007). Project management. London: Thomson Learning. Heerkens,
G.R. (2002). Project Management. New York. McGraw-Hill.
International Standards Organization. (2012). ISO 21500:2012 Guidance on Project Management. Geneva, Switzerland: ISO.
Koehle, T.C. (1983). Project Planning and Management Technique. Public Administration Review, 43 ( 5): 459-466.
In each individuals identified responsibilities, there is an aspect in which accountability is designated. In each instance, it will be this team member's role to keep others on task and moving according to the consult of scheduling.
3. At the start of the project, responsibilities and leadership roles have been distributed ensuring that every member is aware both of the steps necessary to complete the project and of the individual expectations pertaining to them within the scope of the project. In distribution, we would determine that the skills are present to suggest this plan is executable.
Likewise, based on the enthusiasm shown by all team members for entering into the context of the inner-city for project execution, it is fair to argue that the courage for proper implementation is present amongst us. The confidence also present is strengthened by the projection of schedule, which gives us roughly ten months across…
I am hoping you will attend the meeting and briefly describe the achievements in your area.
I will start the meeting by describing the overall project, the progress so far, and the expected outcomes. I will then describe your role in the project, introduce you, and ask for a brief overview and status report. The status report should only be a few minutes long and should focus on the general progress made, major achievements, and any important achievements still to come. The management and client representatives will generally not have technical expertise, so please describe general achievements in layman's terms as much as possible.
I will also be providing management and the client representatives with a written summary of the project status. I would appreciate it if you could provide me with a brief list of the achievements and progress you will note in the presentation.
The meeting will take…
The author offers detailed information concerning what might be expected by the company as they endeavor to complete a contract. The author also explains the risks associated with certain contracts.
Performance assessment is another important issue that arises in the book. Kerzner asserts that the performance of workers should be assessed for several reasons. One of the primary reasons for assessment is to determine both the mistakes and the successes experienced by a team when working on a project. These experiences can be used to assist management teams in the future. Additionally assessment can be used to offer team members incentives. These incentives will provide the team members with the motivation needed to excel in the future. It is important that organization also establish for workers a system in which what is expected of them is evident. Some projects fail simply because people do not understand what is expected of…
References
Kerzner H. (2006) Project Management a systems approach to planning, scheduling and controlling. Ninth edition. Wiley Publishing
Project Management
Like things information technology management, business intelligence typically implemented form a "project" --, a special kind organizational arrangement set specific things a specific period time, opposed a regular ongoing part organizational structure.
Project management: My experience
"To be successful in the field of BI, a project team needs members with an understanding of and appreciation for the information needs of the user community as well as the technologies" (Wu 2005: 1). It is not enough for a project manager to know how the technology works 'for himself.' He or she must know why, how, and if the technology will be useful to others and will have applications in the field. The project manager must truly be someone who can wear two hats: he or she must be fully abreast of developments in the field and thoroughly understand the technology of the project. Yet the manager must also be…
Reference
Wu, J. (2005) Characteristics of an outstanding business intelligence project manager.
Information Management Magazine. Retrieved at:
http://www.information-management.com/issues/20050501/1026063-1.html
Project Management
Assessing Risks as Part of Project Management
The paradox of risk is that it can often be planned for yet rarely occurs in the manner that project managers expect when initiating a new program or project. The paradox of risk is that its severity and costs from a time and resource standpoint, in addition to constraint-based nature, rarely can be entirely planned for or anticipated, especially in the context of large-scale, fast-moving projects (esner, Hobbs, 2012). The intent of this analysis is to explain how risks emerged during the launch of two new products and explain how they initially emerged and eventually helped the project to meet and exceed customer requirements.
Analysis of Risk in High Technology
The overall costs of risk to a project can be catastrophic if not budgeted for initially in the project plan and project costs (esner, Hobbs, 2012). eing part of the new…
Bibliography
Besner, C., & Hobbs, B. (2012). The paradox of risk management; a project management practice perspective. International Journal of Managing Projects in Business, 5(2), 230-247.
Thamhain, H. (2013). Managing risks in complex projects. Project Management Journal, 44(2), 20-35.
What does the acronym BATNA refer to, and why is it important to being a successful negotiator?
The term BATNA refers to the concept in negotiation theory of the best alternative to a negotiated agreement being taken in the event an agreement is not agreed on. BATNA specifically defines the resistance point that any party in the negotiation in a party decide to leave the negotiation and pursue other options.
Having a BATNA-based strategy in place is an excellent negotiation strategy is it alleviates the need to accept aspects of a deal that is not acceptable to one side or the other of a negotiation. To make this more concrete, consider the case of a person negotiating to buy a used car from a friend. From Kelly Blue Book and other secondary sources of car valuations, the friends' care is worth $5,000. The buyer decides that given the wear and…
Project Management
Integrated project management involves the practice of ensuring that the various elements of the project are effectively and efficiently coordinated. This involves making trade-offs amongst competing objectives and alternatives with the aim of meeting or exceed stakeholder needs and expectations. The project management system plays a critical role in the process of allocating resources to a given project or task. esource allocation involves the development the project plan, determining the various resources required in order to accomplish the project successfully and implement the designed plan. Although this may seem like a relatively simple activity, it is a highly complex task that requires skilled personnel and an effective project management system in practice. This is mainly because the acquisition of resources requires funds, which is a limited resource in itself. In fact, the project management team must be skilled in the use of limited resources. This may include the…
References
Lock, D. (2007). Project management. Aldershot, England: Gower
Meredith, J.R. & Mantel, S.J. (2011). Project Management: A Managerial Approach. John Wiley & Sons
Project isk Q's
The network infrastructure is problematic in certain areas of the state, meaning that the existing infrastructure may not support the deployment of the e-mail system in all necessary areas.
Negative isk -- Mitigate
Not having the appropriate network infrastructure presents a negative risk that needs to be mitigated through planning. There is high probability of having problems with infrastructure however the extents of these problems are currently not known and could be severe. Therefore it is recommended to conduct an assessment of the infrastructure capabilities so that they can be modernized to support the system. This should be conducted as soon as possible so it can be built into the project plan.
Several of the vendors have offered to develop specialized e-mail address books and templates for the state users, if their product is selected.
Positive Opportunity -- Exploit
This represents an opportunity for the project to…
Resources or other links, identify software, project management tools, or diagramming techniques that can be used by the project team to help manage risk. One method of research is to enter the term "risk analysis software" or "risk analysis tools" into www.google.com and access the links that apply. For software applications, the most appropriate tools are the ones that interface with Microsoft Project, include Pert diagramming techniques, and/or provide a cost-benefit and analysis feature as well.
http://www.palisade.com/decisiontools_suite/
@RISK for Project is a risk analysis add-in for Microsoft project. @RISK for Project adds Monte Carlo simulation and advanced modeling capabilities so Project Managers can analyze and account for uncertainty in their project plans. @RISK for Project integrate seamlessly into Microsoft Project and provide 38 built-in probability distributions. Account for any risk: task duration, cost, start, effort and more. Run Monte Carlo and Latin Hypercube simulations. Probabilistic branching, IF/THEN Conditional logic, correlations, and more.
Thirdly, having the ability to motivate the project team is a characteristic of a project manager. Projects can have ups and downs for the project team. When target dates seem far from reach, having a project manager with the ability to motivate the group by setting smaller goals and giving incentives can improve the team's morale. Communicating when things go well instead of only talking about the negative can help communication overall and help motivate the team to continue with their hard work (Bastian).
Student 2: (150 words no sources)
It is important for project managers to have effective leadership and there are several characteristics that help make someone an effective leader. A few of the most important characteristics are having patience, organizational skills, and being creative. Patience allows the project manager to deal with troublesome situations by staying calm and being able to make decisions in even the most…
References
Alexandrou, Marios. (September 2, 2011). 16 Project Manager Traits. Retrieved from http://infolific.com/technology/project-management/16-project-manager-traits/
Anonymous. (February 15, 2010). Top Ten Problems, #5: Expect that automatic resource leveling should be able to alter reality. Retrieved from http://www.projhugger.com/projhugger/2010/02/top-ten-problems-5-expect-that-automatic-resource-leveling-should-be-able-to-alter-reality-feb-21.html
Bastian, Bill II. (July 26, 2010). The Top 10 Characteristics of a Perfect Project Manager. Retrieved from
The challenges for the project managers relative to protecting the digital rights of the book are tough to counter, outside of creating a special ink that cannot be accurately photographed digitally or scanned. To attempt this strategy of creating ink that is not easily duplicable would have significantly increased the production costs, squeezing margins on the book as it moved through distribution channels. The risks of electronic duplication at this point can only be met with litigation against those distributors who violated the embargo, thereby making it possible for those fans wanting to gain notoriety by posting pages before the book was available to get the attention they want, even if it means ruining to books' value. In summary, the project managers did assess and respond to the risks they could foresee, and outside of significantly increasing the production cost, they did mitigate the larger risks of the books being…
References
Chapin (2007). Vancouver 2010 Olympic Winter Games. Information Technology Overview. March, 2007. Ward Chapin.
Sutton (2007). Vancouver Olympics 2010's CIO starts training. Neil Sutton. Computerworld Canada. June 14th, 2007. Downloaded July 20th, 2007 from location: http://www.itworldcanada.com/a/ComputerWorld/10cd14aa-3fae-4c01-a7e2-5242397f9a1e.html
Project Management
What is the difference between leadership and management? How do these two terms relate to a project manager?
Leadership defines the vision and mission for a project or business, and then orchestrates the many departments and divisions together for their fulfillment. A strong project leader will also seek ot unify diverse teams by concentrating on making the wide range of talents all combine for greater accomplishment than one person or team alone could attain. In short, a leader know how to use a strong, compelling vision and mission to unify diverse teams and people to a common, challenging goal or objective.
While a leader defines a vision or mission for a business, a manager is given the responsibility of making sure all departments, functional areas of the company and external stakeholders are all orchestrated to a common set of performance metrics. Managers are given the task of ensuring…
Project
Project No.
Product name
Product status
Inspection result
eviewed by ____ Project Manager
Signed ____ Date
Approved by ____ Sponsor
Signed ____Date
Accepted by ____ Client
Signed ____Date
29 -- QA Audit Form - Purchasing Goods And Services
Activity
esponsibility
Findings
Comments / emarks
( x
Scope of Work determined.
Costs estimated.
Verify whether local supply of required product or service has been checked.
Funds available.
Purchasing documents reviewed prior to issue
Delivered goods inspected
30 -- Team Survey
Issue
Yes
Maybe
No
Suggestion
Team members are respected and trusted
Team efforts are recognised and rewarded
Team members are open about problems
All required information is available
Team members contribute to decision-making
Our team has necessary skills & resources
We are encouraged to take initiative
Individual and team goals are clear
We work well together as a team
Organisational systems support our team
31 - Meeting Action Statement
Meeting…
Resources:
Procurement:
Integration:
45 -- Recommended Improvements
Area
If so, the project manager has the necessary tools to assess the project's progress and communicate its status and needs to others.
Conclusion:
Useful tools are defined for project management. Prior to initiation, there are tools for ensuring that all parties agree on the goal, the approach, the costs, the personnel, the timetable, and the "deliverables." Yet, only when these are defined and agreed upon can the project planning begin. Furthermore, only when the plans are defined and agreed upon can the project actually commence! It quickly becomes apparent why we speak in terms of project phases. The project management profession has developed tools, techniques, education, certification, publications, and organizations to enhance the collective skill set of its practitioners. The reason is quite clear - there is a tremendous amount of money at risk and too few projects are complete successes. However, the profession continues to self-improve. Gifted individuals bring…
References
Knack, R.E. (2004, October). Getting your act together: How project management can help you bring in every project on time and under budget. Planning, 70, 1.
Massue, M. (2004, February). A project planning tool. T&D, 58, 1.
Mission and vision. (2007). Project Management Institute. Retrieved February 14, 2008 at http://www.pmi-adsig.org/MissionandVision.html.
Stuckenbruck, L.C. (1981). The implementation of project management: The professional's
Project Management Plan
xyz cur, gutter & ROAD PAVING FOR CITY OF HUNTSVILLE, ALABAMA INCLUDING RESTORATION WORK OF HISTORIC DISTRICT NEAR OLD RAILROAD DEPOT
PROPOSED CONTRACT
The proposed contract for this project management plan is repaving of all the city streets in the city of Huntsville, Alaama. The project will include rehailitation and preservation of the historic district in the area of the old Railroad Depot in Decatur, Alaama to include rick streets, and round-aouts in the area of downtown Huntsville, Alaama. This will e a large-scale cur, gutter, and road paving project with high costs in laor and materials. Included in this project are the following cur, gutter, and road paving as well as rehailitative street construction initiatives:
miles of cur, gutter and street paving in the City of Huntsville, Alaama
round-aouts near the Railroad Depot
miles of rehailitaiton of rick streets leaving streetcar rails in the rick paving…
bibliography&source=web&cd=12&ved=0CDEQFjABOAo&url=http%3A%2F%2Fwww.lakewood.org%2FDocuments%2FPublic_Works%2FTraffic_and_Transportation%2FTraffic_Engineering_Design_Standards_%2528Green_Book%2529.aspx&ei=z_4pVdvFOIOVNrnHgYgN&usg=AFQjCNGzoBz264sitR2izUXRinJ0FdiGzg&sig2=If9wlqlFqIItX2oeXBY3qA
Low Impact Development At the Local Level: Developers' Experiences and City County Support. (2009) Econwest. Retrieved from: http://www.econw.com/media/ap_files/ECONorthwest_Publication_LID-Clackamas-County-Case-Study_2009.pdf
Bid/No-Bid Decision Process Flow (2015) The One Business Proposal. Retrieved from: http://www.theonebusinessproposal.com/bid-no-bid-decision-process-flow.html
Roadway/Transportation -- Capital Improvement Projects (CIP) (nd) Retrieved from:
http://www.douglas.co.us/road-work/construction-capital-improvement-projects/
Project Management
In order to define project management, one must first define what is a project. A project is a temporary activity performed by a group in order to develop a unique service, product, or result. A project is labeled a temporary activity because it has a defined start and end in time. Therefore, a project has a defined scope and resources. This means that a project can only be carried out within a specified time and with the set-aside resources. A project is unique because it is not a something that is carried out on a routine basis within an organization. A project uses a set of operations that are designed to accomplish a particular goal. Therefore, a project team mostly encompasses people who would normally not be working together because they are from different organizations, or geographies. There are different types of projects that range from software for…
References
Beaton, R.D., Johnson, L.C., Maida, C.A., Houston, J.B., & Pfefferbaum, B. (2012). Disaster research team building: a case study of a web-based disaster research training program. Traumatology: An International Journal, 18(4), 86-91.
Burke, R. (2013). Project management: planning and control techniques.
Devi, T.R., & Reddy, V.S. (2012). Work breakdown structure of the project. Int J. Eng Res Appl, 2(2), 683-686.
Kerzner, H.R. (2013). Project management: a systems approach to planning, scheduling, and controlling. Hoboken, NJ: John Wiley & Sons.
Project Management
Customer equirements
Being able to offer customization of tablet PCs and laptops to enterprises and small businesses, all configurable online and at low costs, will successfully differentiate Libertad from the many potential competitors it make encounter in the future. Time-to-market and the tight orchestration of the new product development and introduction (NPDI) process is also critically important to the success of Libertad's business model. CM systems often act as the unifying catalyst across the entire value chain of a business, ensuring customer requirements are accurately captured during the quote phase and then integrated successfully into the production schedules and fulfillment instructions to deliver the final product (Limbasan, usu, 2011). Cloud-based CM systems are providing to be especially adept at managing the wide variation in customer product and service needs while orchestrating internal systems to ensure customers' orders are filled and expectations met (Banerjea, 2011). Where legacy CM systems…
References
Banerjea, D. (2011). Calibrations in the cloud. Quality, 50(3), 40-45.
Cunningham, Patrick, CRM, F.A.I. (2010). IT's responsibility for security, compliance in the cloud. Information Management, 44 (5), HT6-HT8, HT10.
Gido, J., & Clements, J. (2012). Successful project management (5th ed.). Mason, OH: South-Western.
Harding, D., Cheifetz, D., DeAngelo, S., & Ziegler, E. (2004). CRM's silver lining. Marketing Management, 13(2), 27-32.
It takes time for the two leaders to mesh and work together as one unit. In the meantime, there may be some conflict about who does what and with what resources are these things to be done. This can be stressful for everyone and could potentially slow progress.
The dedicated team approach consists of individuals who are devoted solely to the project. This can be an extremely effective method because there is no competition between the needs of the project and various areas of expertise. This makes for a unified team, focused on a quick and efficient completion of the project.
With the ease of this method, come some drawbacks. It can be costly to employ individuals on a full time basis for an assignment with a definite end.
Total concentration on the project can in some ways cause the team to feel like a separate entity from the organization,…
The study of physics, optics and biology of the eye contributed to the development of the quadrant and sextant. The Islamic world also created the concept of a library.
The Crusades of the eleventh century brought the learning of the Islamic world to Europe unfortunately this information was acquired by the act of war. The Crusades also increased the flow of trade, bringing new spices, gemstones and foods to Europe. The Crusades marked the beginning of religion as the basis for society. The Pope and the Catholic Church emerged as the leaders of society and religion as the unifying morality.
Rather than a change in politics, a mini-renaissance occurred during Romanesque period. The study of art, science and culture brought about a change in architectural styling and building materials; increased use of rounded arches and barrel vaults emerged at the same time as the use of metal, enamel, ivory, bronze,…
Project management is an important component in the success of projects undertaken by modern business organizations or enterprises. Organizations embark on project management initiatives to help promote the success and effectiveness of their various projects. However, organizations across the globe face substantial project failure rates, which are often costly since they waste millions of dollars in the process. Given the likelihood of project failures, organizations undertake several measures to help enhance the success of their projects. Despite these efforts, project failure is still a reality that many organizations worldwide have to struggle with. This paper examines three reasons why a project can fail and discusses solutions that can be utilized by organizations to eliminate the problem and turn the project or initiative into a successful venture.
Reasons for Project Failure
Pinto & Mantel (1990) states existing literature on project management has different definitions and unique examples of the concept of…
Astra Zeneca
Project Proposal to Streamline Operational Processes
The pharmaceutical industry in general is undergoing extreme amounts of external pressures. Not only has the economic environment since the global recession been less than ideal, but there are increasing regulatory pressures and healthcare reforms that are also expected to dramatically change the environment in which AstraZeneca operates. It is in this environment that the organization must streamline its operations so that it can be more lean and flexible when adapting to the new landscape that will emerge in the near future.
This project proposal outlines a project portfolio management program that can be implemented to ensure the organization can eliminate any unneeded waste in its operations. This portfolio will be implemented across many divisions and will require a schedule of one year. Each division will have an individual project that is tailored to a scope that suites there individual department's needs.…
Works Cited
AstraZeneca Global. (N.d.). About Us. Retrieved from AstraZeneca Global: http://www.astrazeneca.com/About-Us
Benta, D. (2011). On Best Practices for Rick Management in Complex Projects. Informatica Economica, 142-152.
Hirschier, B. (2013, June 10). AstraZeneca buys U.S. lung drug firm Pearl for up to $1.15 billion. Retrieved from Reuters: http://www.reuters.com/article/2013/06/10/us-astrazeneca-pearl-idUSBRE95904U20130610
WHO. (N.d.). Pharmaceutical Industry. Retrieved from World Health Organization: http://www.who.int/trade/glossary/story073/en/index.html
Role of Project Manager in Different Projects
The project manager plays an instrumental role in ensuring project success. It could actually be argued that the project manager is the most important person in any project management environment (Meredith and Mantel, 2011). Essentially, the project manager carries the overall responsibility for ensuring the project is successfully planned, designed, executed, monitored, controlled, and closed (Thomsett, 2010; Young, 2013). Whereas the role of the project manager tends to be similar in virtually all projects, there could be some differences from one type of project to another (Winch, 2010; Project Management Institute [PMI], 2013). This essay critically evaluates the role of the project manager in three contrasting types of projects.
As per the conventional project management methodology, the role of the project manager stretches across four major functions: planning (laying out a plan for achieving the overall objective of the project); execution (implementing the…
Information Technology -- Project Management
Functional structure is the classic hierarchy of a CEO, departmental managers reporting to the CEO, and skilled employees in each department (Schwalbe, 2014, p. 49). This is favorable for its flexible use of personnel with specialized skills from each department but unfavorable because each department is focused on its own needs, with low project motivation and awkward intra-departmental coordination.
Project structure has project managers report to the CEO (Schwalbe, 2014, p. 50). Each project manager has staff grouped for a specific project. This is favorable because the project is the focus, and employees are specially assembled, have specific tasks and answer only to their project manager but is unfavorable because there may be duplication of work in different project teams, lack of loyalty to the organization and lack of job continuity.
Matrix structure is a hybrid (Schwalbe, 2014, p. 51), with classic departmental managers but…
Works Cited
Bolman, L. G., & Deal, T. E. (2008). Reframing organizations. Retrieved from www.slideshare.net: http://www.slideshare.net/PhilVincent1/fourframe-model
Method123. (n.d.). Project Management Life Cycle. Retrieved from www.method123.com: http://www.method123.com/project-lifecycle.php
Schwalbe, K. (2014). Information technology project management (Rev. 7th ed.). Boston, MA: Cengage Learning.
Project Management
Grey Sloan Memorial Hospital was founded in 1982 and has since then offered medical services to the public. The health care organization is located in central Washington DC and has been one of the renowned hospitals in the region. However, in the past six months, the health care organization has experienced a great influx of critical and acute patients needing medical treatment. The chief of general surgery has since then presented a project to be executed with the purpose of expanding the ICU unit of the hospital to cater to more patients. The main objective of the project is to increase the space of the ICU unit in order to cater to more patients. Another objective is also to procure advanced technology that will facilitate the nurses and doctors in the treatment of acute and critical patients. Once completed, Project Grey will have an insurmountable impact on Grey…
References
Essays, UK. (2013). Investigating The Principles Of Project Management Information Technology Essay. Retrieved from http://www.uk ***.com/essays/information-technology/investigating-the-principles-of-project-management-information-technology-essay.php?cref=1
Hill, G. M. (2014). The Complete Project Management Office Handbook, Third Edition. Boca Raton: CRC Press
Kliem, R. L., Ludin, I. S., Robertson, K. L. (1997). Project Management Methodology: A Practical Guide for the Next Millenium. New York: Marcel Dekker, Inc.
Lester, A. (2014). Project Management, Planning and Control. Oxford: Butterworth-Heinemann.
The remaining hour at each regional office is required to set up the router, and after this is accomplished all of the necessary hardware components will be installed. The installation of printers in the regional offices and speakers in all three offices will require fourteen-and-a-half to seventeen-and-a-half hours, depending on the number of printers required at the main office, but these can be installed with minimal disruption and can thus be carried out during the regular work week following the installation of the other components.
The workstations are of more pressing concern both for their necessity and the time necessary for the installation of each one. It will take approximately one hour to set up each workstation, and with sixty-five workstations needed in the three offices combined, it is unlikely that any office could be completed in even a full weekend's work. Given the high level of disruption tat installation…
Project Management
Project Information, History, Intent, and Life Cycle
Gray and Larson, (2008) define project as "a temporary endeavor undertaken to create a unique product, service, or result." (p 5). Essential feature of a project is that it has a defined beginning and end often subject to time or fund constraint to achieve stakeholder's goals and objectives. Gray and Larson (2008) differentiate between project and program. "A program is a group of related projects designed to accomplish a common goal over an extended period of time." (Gray and Larson, 2008 p 6). Major goal of any project is to satisfy customers' objectives, and features of a project are they:
have established objectives.
Have a life span definitely a start and the end.
Usually involve several professionals and departments.
Have specific costs, time and performance requirements.
However, a project is different from program where workers are performing repetitive operations daily within…
Reference
Larson, E.W. & Gray, C.F. (2011). Project Management - The managerial process (5th Edition), New York, The McGraw-Hill/Irwin.
Martin, P., and Tate, K. (2004). Getting Started in Project Management (New York:
Wiley,)
Programme Management Office (2012).Project Charter & Scope Statement. Institute of Technology. Dublin.
"
There are several benefits that a global consumer electronic firm could derive from inter-project learning.
First, inter-project learning allows firm to enhance project completeness. Prencipe, & Tell (2001) argue that inter-project learning allows firms to execute a project in a best method. In the present competitive market environment, project is the key to the dynamic competitive capabilities. Typically, accumulation of knowledge builds project competencies, which could enhances market performances of a global consumer electronic firm. Experience has revealed that project-based firm has been able to record high profit in the market environment. ( Brady, and Davies, 2004).Through inter-project learning, a global consumer electronic firm will be able to better estimate the project costs and this will enhance ability to deliver the project with success. Moreover, the inter-project learning will enable the company to estimate the project risks efficiently. By better evaluating the project risks, the project manager will be…
References
Anbari, F.T., Carayannis, E.G. And Voetsch, R.J. (2008) Post-project reviews as a key project management competence, Technovation, Vol. 28, pp.633-643.
Brady, T. And Davies, a. (2004) Building of the Project Capabilities: From Exploratory to Exploitative Learning, Organization Studies, Vol.25, No.9, pp.1601-1621.
Prencipe, a. & Tell, F. (2001). Processes and outcomes Inter-project learning: knowledge codification in project-based firms. Research Policy. 30: 1373 -- 1394
Plan:
Project Management
Supporting Activity Project Characteristics
• What are some of the characteristics that differentiate projects from other functions carried out in the daily operations of an organization? List some examples of work considered to be a project and work not considered to be a project.
The main trait and attribute that differentiates projects and non-projects is the duration of the event in question. Events that are ongoing in perpetuity are not projects. Projects, instead, are tasks/jobs (or collections of the same) that has a definite start point and end point as well as a budgetary estimate and a depicting/listing of the resources needed for the project. The project is planned, commence and then evaluated whereas operations tasks are normal daily tasks that do not generally halt unless there is a business need or reason for it (PMBOK, 2013).
For example, work tasks like checking email or answering customer phone…
References
PMBOK. (2013). A guide to the project management body of knowledge (PMBOK®
guide) (5th ed.). New York, NY: Project Management Institute.
Problems and risks related to contracted a new company relate both to cost, safety measures and legal liability. The primary consideration is cost, as this is the major problem related to the issue mentioned above. The first requirement for the new company would then have to be a cost that is as close as possible to the price to date charged by Walkers Ausgas before the increase. Being a transport company, safety is also of utmost importance. Hence, it has to be ensured that the new company will deliver a service either of similar or higher quality than Walkers Ausgas. Pricing and quality therefore have to be in optimal balance in order to minimize the risk of legal liability.
pecifically then, the risks include the following:
3.1 afety
afety is one of the most important issues at Kingsgrove. Ensuring that proper testing and certification measures are in place minimizes the…
Sources
Australian Institute of Petroleum. Petroleum Topic Fact Sheet. Retrieved June 18, 2006 at http://www.aip.com.au/industry/fact_alt_fuels.htm .
Beer, T., Grant, T., Brown, R., Edwards, J., Nelson, P., Watson, H., and Williams, S. (2000). Life-cycle Emissions Analysis of Alternative Fuels for Heavy Vehicles - Stage 1 CSIRO Atmospheric Research Report C/0411/1.1/F2 to the Australian Greenhouse Office, March 2000.
Hill, R. (2000). Converting $12.4 million into Improved Greenhouse Performance. Media Release. Leader of the Government in the Senate. Minister for the Environment and Heritage. August 21, 2000. Retrieved June 18, 2006 at http://www.deh.gov.au/minister/env/2000/mr21aug00.html.
Werner, C. (2006). National Clean Bus Update. Environmental and Energy Study Institute. Retrieved June 18, 2006 at http://www.eesi.org/publications/Newsletters/Clean%20Bus%20Update/March%202006.htm
Project Management and the Transformation System
In this research paper, the author discussed he concept of project management employing in a construction firm. The author described briefly, the mission of construction organization, i.e. its product and services, intended markets, and how the product or service is distinct from those offered by competitors. The author also analyzed the scope of integration of project management concepts such as; Project Planning, Portfolio, Life Cycle, Team Management, Scheduling and Controlling the Project. Firms can benefit by integrating project management concepts to overcome the issues like team management, planning and managing. A project is considered winning if it completes on time, goes on to follows a pre-set schedule, remain within the provided budget, and finally its customers are pleased. For successful completion and for the satisfaction of costumers, it should have a specific time frame and must achieve the prior set targets by deploying resources…
References
Bennet F. Lawrence (2003), The management of construction: a project life cycle approach, UK: Oxford: Butterworth-Heinemann
Derek Torrington and Laura Hall (2001), Personnel Management HRM in Action, UK: Prentice Financial times
Gail Blackstone (2003), Performance Management in Project Management, UK: Journal of Personnel Management
Gelbard, R. & Carmeli, A. (2009). The interactive effect of team dynamics and organizational support on ICT project success. International Journal of Project Management, 27(2), 464 -470. doi:10.1016/j.ijproman.2008.07.005
Project Management Email esponse
Choosing a Project
In order to determine which of the three projects is best, it is important to conduct a feasibility study. That is done to take a careful look at each one of the projects offered and examine what they provide to the company in the future. Of course, it is not possible to know exactly what will happen, and there are only projections and assumptions that can be made with any new product launch or adjustment (Farris et al., 2010). Still, the best way to make these is through studying the feasibility of the different options provided in order to make the best and most educated plan for the future (Farris et al., 2010; Levy, 2002). This study shows that the Palomino project is going to be the recommended option between the three choices available, because it provides the most balance. There are a…
References
Farris, P.W., Bendle, N.T., Pfeifer, P.E. & Reibstein, D.J. (2010). Marketing metrics: The definitive guide to measuring marketing performance. NJ: Pearson Education, Inc.
Levy, D.M. (2002). Research and development. In David R. Henderson (ed.). Concise Encyclopedia of Economics (1st ed.). NY: Library of Economics and Liberty: OCLC
Project Management
Review the "Lessons Learned" section of the project risk diagram. Describe how the Lessons Learned activity helps you become a stronger project manager, who else it helps in the project team and also describe how it helps PMO. 200 words
Documenting the lessons learned is one of the most important aspects of the closure phase of the project. It is important to an individual project manager because they can reflect on their performance and find areas for improvement. A project manager, with the assistance of their team and supervisors, can find areas in their management capacity in which they can work on for future improvements. They can also make note of things that went right so that they can recreate those items in the future. For instance, if a change management procedure or a communication medium worked well then the project manager will know to use these in…
Works Cited
Anderson, P., & Tushman, M. (1991). Managing through Cycles of Technological Change. Research Technology Management, 26-31.
Rettich, K. (2011). Using the Wiki to Deliver Paperless Software Documentation. IPCC, Professional Communication Conference (IPCC), 2011 IEEE International, 1-8.
Sarin, K. (2010, April 19). Nature of Training and Development. Retrieved October 15, 2011, from HRM Training and Development: http://www.scribd.com/doc/10041934/HRM-Training-Development
Shtub, E. (2004). Project Management: Processes, Methodologies, and Economics. London: Prentice-Hall.
Rather, the issue needs to be seen from all angles to truly evaluate the needs and responses to these risks as they are identified.
a. List the potential threats and uncertainties associated with staging the Rock 'n'
Reggae concert using the information contained in this case description.
Threats will include drunken or otherwise inebriated fans, accidental fires (especially from electricity or smoking). Also, acts of God such as weather disasters must be factored in.
b. As noted in the scenario, the capacity of the stadium is 8000. Similar sized concert data were referenced in preparation for that given year in the United States. Deaths should considered to give an adequate barometer for preparation for a worst case scenario (Upton, 2004) .
In an international study that the team used in preparation for this project, 136 hundred and thirty-six victims died in 29 separate incidents that occurred in 20 different countries/territories:…
Works Cited
How to organise a rock concert. (2008, June 04). Retrieved from http://community.jobscentral.com.sg/node/131 .
Upton, M. (2004, January). Risk analysis for major concert events, the benefit of hindsight. Retrieved from http://www.www.safeconcerts.com/documents/riskassessment.pdf.
Project management. Retrieved from http://www1bpt.bridgeport.edu/sed/projects/cs597/unfiled/zhipingli/report.html.
Project Management
Elements of Business: Project Management
Postings to the Discussion Board
The Critical Path of PET charts
Successful realization of business goals of any organization, there has to be an efficient project management in control. Most performing organizations bare witness of how the good managerial functions and change has brought to them. The critical path will always entail the sequencing of duties and events, to ensure that a project is not delayed. The critical paths of most projects are designed in search a manner that the delay or acceleration of the entire project is determined by one activity. Once one activity is altered, it leads to the entire change of project timeline. The process of creating the critical path in most cases requires activity sequencing (Sawyer, 2009).
Prioritizing the correction of existing projects
In cases where the project has steps that follow a certain sequence, a certain task must…
References
Adams, T. & Means, J. (2005) Facilitating the Project Lifestyle: Skills and Tools to Accelerate Progress for Project Managers, Facilitators and Six Sigma Project Teams: New York, John Wiley and Sons.
Haynes, M.E. (2002) Project Management: Practical Tools for Success: New York, Cengage Learning.
Jones, R. (2007) Project Management Survival: A Practical Guide to Leading Managing and Delivering Challenging Projects: New York, Kogan Page Publishers.
Paula, M. & Humphrey, C.J. (1996) Orientation to Home Nursing: New York, Jones and Bartlett Learning publishers.
Project Management
Although desirable, it is quite difficult to start with a dictionary definition of project management, mainly because of the complexity involved in the process, a complexity impossible to cover with a simple two-line definition. Hence, it is probably best to describe the process, underlining thus the main characteristics of project management.
A company's strategic perspective may, perhaps, be amply resumed to two strategic concepts around which everything else revolves: objectives and projects. Any company will start building its analysis around a series of drivers and objectives that the company may have for the next few years. These objectives need to be only a couple, because we may assume that if the company had 15 objectives for the next years, its resources will be too split and it will not be bale to fulfill any of them efficiently.
Once the company has defined its list of goals, it needs…
Bibliography
http://www.123projectmanagement.com/project-management-definitions.html
2. Mullaly, Mark E. Project Management: A New Definition. July 2003. On the Internet at http://www.gantthead.com/article.cfm?ID=183068
http://www.netcoach.com/projman/pmwb2.html
http://www.spottydog.u-net.com/guides/define/frameset.html
Project Management
In The Custom Woodworking Company, hereafter known as "Woody's," there were numerous project management problems that appeared from the very beginning, and they only got worse as the product was carried out. The Woody 2000 project was not well conceived, and that was the first problem encountered. When a project is going to begin, it needs to be thoroughly planned out first (Wideman, 2001b). There was little planning that took place with this project, as it was suggested and seemed to snowball from that point. Before Woody knew what was happening, a budget was proposed and there was a meeting with the engineers who were going to add to the building (The Custom Woodworking Company, 2012). Even then, the project started off badly. Originally, the desired plan was to move the company's location to a huge facility where rapid expansion could take place. However, Woody and his wife…
References
Gheorghiu. F. (2008). Starting a PMO from Scratch: A Challenge or Unbearable Burden. PM World Today. Vol. X, Issue III.
History of Project Management. (2012). Retrieved July 29, 2012 from http://www.lessons-from-history.com/node/16
Lavell, D. & Martinelli, R. (2008). Program and Project Retrospectives: An Introduction (Part 1 of a Series). Vol. X, Issue I.
The Custom Woodworking Company - Woody 2000 Project. (2012). Retrieved on July 29, 2012 from: http://www.maxwideman.com/papers/woody2000/intro.htm .
Project Management
For the tax preparation software, the status would be yellow. Everything appears to be moving forward properly at this time and there have not been any reasons to get behind or to have overtime on the project. However, there is more to the issue than just what is taking place at the moment. There are concerns that may present themselves in the future, and in order to plan for these properly it is necessary to focus on what could occur based on these concerns. There are two risks that are the most important to consider. These are that it is hurricane season in Florida, where three of the developers are located, and that the one person who decided to take early retirement (and is leaving in a week) is the only person who knows how to work with the IS to get approval for the final product. All…
References
Dinsmore, P.C. (2005) The right projects done right! NY: John Wiley and Sons.
Ireland, L.R. (2006) Project management. NY: McGraw-Hill Professional.
Nokes, S. (2007). The definitive guide to project management (2nd ed.). London: Financial Times/Prentice Hall.
Phillips, J. (2003). PMP project management professional study guide. NY: McGraw-Hill Professional.
Project Management
How well the client's value was understood.
Normally the client's values are not understood well or possibly at all. This often results in many delays or modifications because if the values are not understood then the quality is unlikely to meet the end-users expectations. There are many ways to try to mitigate these risks in a project during the planning phase. However, there are often a wide variety of different stakeholders that may have different expectations for the project. Therefore, it is important to incorporate as many viewpoints as possible to get something of a comprehensive account of the stakeholder's values. Furthermore, in many cases stakeholders do not realize what their own values and expectations for a project actually are. Thus it is important for a project manager to try to tease out as much critical information from the stakeholders as possible so that they know how to…
(Braunschweig; Day, 150)
Most of the current generation of project managers expects the project management tools to furnish them with almost real-time knowledge in order to facilitate their decision-making. Some of these tools like DOFF, "Field of the Future," "Smart Fields," Microsoft's "Oilfield Connectivity" and i-Fields are currently being examined by exploration and production oil companies. Some of these tools have the capability of generating information from apparently incongruent data and helping managers take important decisions based on them. (Oilfield Connectivity - Capturing the Value of the Digital Era)
There is substantial amount of risk in oil exploration and production since the concerned target is located many thousands of feet under the ground. There are a number of factors that can cause uncertainties and risks in these fields which may include the weather, people, geology, safety, and availability of tools and equipment. Agility is an important requirement in the oil…
References
Barkley, Bruce T. Integrated Project Management.
McGraw-Hill Professional, 2006.
Braunschweig, Bertrand; Day, Ron. Artificial Intelligence in the Petroleum Industry:
Symbolic and Computational Applications. TECHNIP. 1995.
The project manager should at all times be present to monitor and ensure that it's the correct mixing of materials being done, it's the right quality of material being used, and it's the right amount of time being given to the treatment process in the different construction phases. In the event that this is not observed, and the building is erected, there's a high probability that the building will deteriorate at an early stage before its lifespan or even collapse as witnessed almost daily Zwikael and Ahn, 2011()
As a construction is ongoing, a major contribution to its success is the relationship between the different stakeholders. This includes the architect, the engineer, the owner, the contactor and the workers. In order to smoothly run the project and limit malice and incorporation, there should be a union and set goals and objectives between all these parties so as to ensure everyone…
References
BUYS, A., BENDEWALD, M. & TUPPER, K. 2011. Life Cycle Cost Analysis: Is it Worth the Effort? ASHRAE Transactions, 117, 541-548.
CHRIS HENDRICKSON 1998. Project Management for Construction. 2 ed.: Prentice Hall PTR.
EHRENFELD, J.R. 1996. Risk Assessment and Management: A Critique of Current Practices and Policy Implications. Organization & Environment, 9, 376-404.
GURCANLI, G.E. & MUNGEN, U. 2009. An occupational safety risk analysis method at construction sites using fuzzy sets. International Journal of Industrial Ergonomics, 39, 371-387.
Business - Management
Project Management: Lessons Learned From Project Plans in the New World The article Project Plans in the New World (osenwinkel (1995) provides many useful insights into how to manage…
Read Full Paper ❯Business - Management
EP Project Plan Objective of this project is to present the project plan for the Enterprises esources Planning (EP). The whole project plan will span for approximately 18 months.…
Read Full Paper ❯Transportation
Power Project Plan make a microeconomic analysis automobile industry. Project: Will Power price According resources availed countries, explicate price variation products services relation automobile industry special reference car industry.…
Read Full Paper ❯Business
CRM Project Plan CustomerSuccess2015 Project Description Connecting with and keeping customers buying over the long-term is essential for any business to grow over time. One of the most cost-effective…
Read Full Paper ❯Business - Advertising
MacVille Villiano Coffee Project Plan Final Project Overview Overall, the project has been a success. Despite a few mishaps and lessons learned, the venue was a hit and the…
Read Full Paper ❯Business - Management
Motorcycles -- The Comprehensive Project Plan 1.Describe project scope project management plan. Align plan strategy recommended senior executives Assignment 2. 2.Analyze type staff company order make manufacturing switch motorcycles…
Read Full Paper ❯Business - Advertising
Coffee Launch Event Stakeholders Stakeholder Stakeholder Group Interest in Project MacVille Adelaide Project Management Committee Adams and Elizabeth Barista Champion ichmond Hotel Competition winner Venue for Marketing and promotion…
Read Full Paper ❯Transportation
Paws Veterinary Hospital Pets Hospital Betoull Dashti 16108 Sara Al Hindi 20088 The 3,000,000 KD capital input in the business will be used to buy the necessary equipment so…
Read Full Paper ❯Death and Dying (general)
Health Promotion for End-Stage Dementia End-Stage Dementia Care Health Promotion Plan for End-Stage Dementia Health Promotion Plan for End-Stage Dementia Globally, an estimated 35.6 million adults are living with…
Read Full Paper ❯Sports
video is very shocking because it basically exposes how law enforcement officers will use duress or "wear down" a suspect and provide that suspect with details of a crime…
Read Full Paper ❯Business - Management
The use of Gantt charts for enabling interprocess integration and knowledge management in the A&D industry is a best practice for also managing process-intensive projects (Singh, Keil, Kasi, 2009).…
Read Full Paper ❯Business - Management
Project schedule and risk management are some of the most important components of project management. These components play a crucial role in project planning, which is a process used…
Read Full Paper ❯Management
.....project management approach is increasingly becoming popular in today's workplace. Organisations are ever more recognising the benefits of accomplishing tasks and activities as projects -- better task coordination, quicker…
Read Full Paper ❯Business - Management
Project isk Management isks associated with projects successful completion A project is an undertaking of human beings towards satisfying world needs. Projects are endeavors with a defined beginning and…
Read Full Paper ❯Business - Management
Project Management Techniques: Signatures Inc. is a company that focuses on manufacturing personalized products like coffee mugs and pens with company logos. The firm generates over $40 million in…
Read Full Paper ❯Business - Management
It is essential to determine the critical path and shortest and long paths based on the allocated time. The network diagram for the wedding planning project also provides an…
Read Full Paper ❯Business - Management
Project Management Project Libra: To Terminate or Not to Terminate Visit www.itweek.co.uk/News/11329438 to see the string of news stories related to Project Libra. Identify some of the sources of…
Read Full Paper ❯Business - Management
The reasons for optimization of the project plan are to save time, to save money and to save in over-allocation of human resources to the project. Management of people,…
Read Full Paper ❯Urban Studies
From such goal, problems can be avoided within the process of building the house. Moreover, with the help of the process of identifying the needs first before going into…
Read Full Paper ❯Business - Management
Project Management Scope Management Small LAN's Inc. installed a Local Area Network at the new Spring Academy Childcare Center. The project came in a few weeks late becaue of…
Read Full Paper ❯Business - Management
Project Management The part one of this project discusses several challenges that can affect the success of a project. Ineffective project management and inefficient project planning are part of…
Read Full Paper ❯Leadership
In each individuals identified responsibilities, there is an aspect in which accountability is designated. In each instance, it will be this team member's role to keep others on task…
Read Full Paper ❯Business - Management
I am hoping you will attend the meeting and briefly describe the achievements in your area. I will start the meeting by describing the overall project, the progress so…
Read Full Paper ❯Business - Management
The author offers detailed information concerning what might be expected by the company as they endeavor to complete a contract. The author also explains the risks associated with certain…
Read Full Paper ❯Business - Management
Project Management Like things information technology management, business intelligence typically implemented form a "project" --, a special kind organizational arrangement set specific things a specific period time, opposed a…
Read Full Paper ❯Education - Computers
Project Management Assessing Risks as Part of Project Management The paradox of risk is that it can often be planned for yet rarely occurs in the manner that project…
Read Full Paper ❯Education - Computers
What does the acronym BATNA refer to, and why is it important to being a successful negotiator? The term BATNA refers to the concept in negotiation theory of the…
Read Full Paper ❯Business - Management
Project Management Integrated project management involves the practice of ensuring that the various elements of the project are effectively and efficiently coordinated. This involves making trade-offs amongst competing objectives…
Read Full Paper ❯Education - Computers
Project isk Q's The network infrastructure is problematic in certain areas of the state, meaning that the existing infrastructure may not support the deployment of the e-mail system in…
Read Full Paper ❯Business - Management
Thirdly, having the ability to motivate the project team is a characteristic of a project manager. Projects can have ups and downs for the project team. When target dates…
Read Full Paper ❯Transportation
The challenges for the project managers relative to protecting the digital rights of the book are tough to counter, outside of creating a special ink that cannot be accurately…
Read Full Paper ❯Business - Management
Project Management What is the difference between leadership and management? How do these two terms relate to a project manager? Leadership defines the vision and mission for a project…
Read Full Paper ❯Business - Management
Project Project No. Product name Product status Inspection result eviewed by ____ Project Manager Signed ____ Date Approved by ____ Sponsor Signed ____Date Accepted by ____ Client Signed ____Date…
Read Full Paper ❯Business - Management
If so, the project manager has the necessary tools to assess the project's progress and communicate its status and needs to others. Conclusion: Useful tools are defined for project…
Read Full Paper ❯Business
Project Management Plan xyz cur, gutter & ROAD PAVING FOR CITY OF HUNTSVILLE, ALABAMA INCLUDING RESTORATION WORK OF HISTORIC DISTRICT NEAR OLD RAILROAD DEPOT PROPOSED CONTRACT The proposed contract…
Read Full Paper ❯Business - Management
Project Management In order to define project management, one must first define what is a project. A project is a temporary activity performed by a group in order to…
Read Full Paper ❯Business
Project Management Customer equirements Being able to offer customization of tablet PCs and laptops to enterprises and small businesses, all configurable online and at low costs, will successfully differentiate…
Read Full Paper ❯Business - Management
It takes time for the two leaders to mesh and work together as one unit. In the meantime, there may be some conflict about who does what and with…
Read Full Paper ❯Drama - World
The study of physics, optics and biology of the eye contributed to the development of the quadrant and sextant. The Islamic world also created the concept of a library.…
Read Full Paper ❯Business - Management
Project management is an important component in the success of projects undertaken by modern business organizations or enterprises. Organizations embark on project management initiatives to help promote the success…
Read Full Paper ❯Business - Management
Astra Zeneca Project Proposal to Streamline Operational Processes The pharmaceutical industry in general is undergoing extreme amounts of external pressures. Not only has the economic environment since the global…
Read Full Paper ❯Business
Role of Project Manager in Different Projects The project manager plays an instrumental role in ensuring project success. It could actually be argued that the project manager is the…
Read Full Paper ❯Transportation
Information Technology -- Project Management Functional structure is the classic hierarchy of a CEO, departmental managers reporting to the CEO, and skilled employees in each department (Schwalbe, 2014, p.…
Read Full Paper ❯Transportation
Project Management Grey Sloan Memorial Hospital was founded in 1982 and has since then offered medical services to the public. The health care organization is located in central Washington…
Read Full Paper ❯Transportation
The remaining hour at each regional office is required to set up the router, and after this is accomplished all of the necessary hardware components will be installed. The…
Read Full Paper ❯Business - Management
Project Management Project Information, History, Intent, and Life Cycle Gray and Larson, (2008) define project as "a temporary endeavor undertaken to create a unique product, service, or result." (p…
Read Full Paper ❯Business
" There are several benefits that a global consumer electronic firm could derive from inter-project learning. First, inter-project learning allows firm to enhance project completeness. Prencipe, & Tell (2001)…
Read Full Paper ❯Business - Management
Project Management Supporting Activity Project Characteristics • What are some of the characteristics that differentiate projects from other functions carried out in the daily operations of an organization? List…
Read Full Paper ❯Business
Problems and risks related to contracted a new company relate both to cost, safety measures and legal liability. The primary consideration is cost, as this is the major problem…
Read Full Paper ❯Business - Management
Project Management and the Transformation System In this research paper, the author discussed he concept of project management employing in a construction firm. The author described briefly, the mission…
Read Full Paper ❯Business
Project Management Email esponse Choosing a Project In order to determine which of the three projects is best, it is important to conduct a feasibility study. That is done…
Read Full Paper ❯Business - Management
Project Management Review the "Lessons Learned" section of the project risk diagram. Describe how the Lessons Learned activity helps you become a stronger project manager, who else it helps…
Read Full Paper ❯Business - Management
Rather, the issue needs to be seen from all angles to truly evaluate the needs and responses to these risks as they are identified. a. List the potential threats…
Read Full Paper ❯Business - Management
Project Management Elements of Business: Project Management Postings to the Discussion Board The Critical Path of PET charts Successful realization of business goals of any organization, there has to…
Read Full Paper ❯Business - Management
Project Management Although desirable, it is quite difficult to start with a dictionary definition of project management, mainly because of the complexity involved in the process, a complexity impossible…
Read Full Paper ❯Business
Project Management In The Custom Woodworking Company, hereafter known as "Woody's," there were numerous project management problems that appeared from the very beginning, and they only got worse as…
Read Full Paper ❯Business - Management
Project Management For the tax preparation software, the status would be yellow. Everything appears to be moving forward properly at this time and there have not been any reasons…
Read Full Paper ❯Business - Management
Project Management How well the client's value was understood. Normally the client's values are not understood well or possibly at all. This often results in many delays or modifications…
Read Full Paper ❯Business - Management
(Braunschweig; Day, 150) Most of the current generation of project managers expects the project management tools to furnish them with almost real-time knowledge in order to facilitate their decision-making.…
Read Full Paper ❯Business - Management
The project manager should at all times be present to monitor and ensure that it's the correct mixing of materials being done, it's the right quality of material being…
Read Full Paper ❯