Hindustan Aeronautic Limited Delivery Of Doors Hindustan Essay

PAGES
5
WORDS
1625
Cite

Hindustan Aeronautic Limited (Delivery of doors) Hindustan Aeronautics Limited

The Hindustan Aeronautics limited is a national parastatal company venturing in industrial defense and aerospace. The company was founded in the early 1940s and has based itself in the city of Bangalore in India. The company majors in the manufacture, assembly, navigation of aircrafts and related equipment, and communication apparatus. Other than those main operations, the company has also ventured in delivering doors in windows through its supply chain management department. The business venture in the new supply departments was propelled by the establishment of the door manufacturing unit in the company's plant. The company operates under the motivation of its operational values, mission and vision statements depicting that its goals are to provide high-quality designs in aeronautic tools and cost-effective to all its customers.

Executive Summary

Hindustan aeronautics Limited has achieved in its supply and production of automobile accessories but has also majored in the production of doors and windows of aircrafts. Its success is associated with the advanced and creative designs of the doors. The demand of manufacturing passenger doors on various aeronautics companies has increased, and for that effect, Hindustan engaged into the production and export to other customers venturing in the same industry. The company has had a high number of dedicated customers interested in the designed doors. Consequently, it has been entrusted with several contracts mostly from the customers stipulating the costs of purchase and delivery periods of the products.

The Hindustan Aeronautics Limited has made an immense push through when it comes to the door exports. It is a reliable conjunction of the assembly team and the supply chain. A production flow is strictly adhered to while conducting the effectual process of door delivery. Similarly, the delivery is done at window stages for each scheduled period. A purchase order is relayed by the customer, at which HAL comes up with procurement of the necessary materials, costs and labor. The period summed for in this stage adds up to 3 months. Receipt of the materials, costs and labor are then received in a timeframe of 8 months followed by a receipt of inspection of the assembly plant and the storage facility for the already manufactured doors. However, other parts incorporated in the assembly are necessitated and are delivered in a period of 3 months, followed by an 8-phase process of the door assembly.

HAL's supply chain management takes accountability immediately after assembly completion. The departmental sector of supplies oversees clearance from the customs office in ensuring that the products being dispatched are up to the standards. This takes a period of 2 days. Confirmation on the dispatched products is then supplemented by an airlift to the customer's assembly plants. The summed process is required to enable the supply chain to deliver the doors to customers at the stipulated windows.

Problem Statement

The Hindustan Aeronautics Limited has addressed the challenges they face in the industry. It sums to a one time progress in time especially while meeting the demands in the opportunity window, resultant to inefficacy to the supply chain management. The main predicament has been the incapacity of management to deliver the assembled doors at the required window. The effects, consequently affect the customer's plants inconveniencing their production plans of airbuses, which cannot be completed without doors. Several unpredictable circumstances have been accredited to the challenge of keeping up with the contractual agreement.

Similarly, there have been management issues with time durations of assembling at each developmental stage. Currently, the company works under high inventory management costs that undermine the entire delivery of the doors on time. It has also been difficult to handle outsourcing of consumables and materials, and necessitated shelf life door parts. There has been less shelf life of the parts since the mode of transportation to the...

...

Consumption of the shelf life parts is not predictable since under certain circumstances leftovers of the parts lie under 4 to 5 months upon receipt of the shelf life. From this context, HAL tries to show-case its challenges in the door export project. The said contract not only had agreements on delivery, but also on the mode of being encrypted on the design and drawings doors.
Analysis

Problems facing the company have been linked to lack of external input in the new assembly of doors. Addition of manpower, achievement of operational efficiency and high quality has been the main factors left out in the production of the doors. These factors have led to the far fetched effects such as problematic delivery of doors in windows. The delivery issue has been accredited to factual company culture of not wanting to incur additional costs out of the budget from external consumables, inventory management costs and additional safety units of stock.

From the statistical data recorded from 1992 to 2009, the company has failed in standardizing its deliveries in the set windows. Though the trend has been increasing, it has been with various inconsistencies. According to the data represented, the low economic order quantity was only attained in the month of January. Inconsistencies encountered were related to the high running costs from the total assemblies carried out. Besides, cascading effects from the subsequent delays in the sub-assembly phase has pulled down to resultant phases and eventually to the delivery process. It has been estimated to 34.4% of outside window deliveries.

Computational analysis from the company's statistical data depicts that 9.7% of the total delivered doors was from the assemblies that were scheduled on or before the stipulated time. Prior assembly of the doors before the declaration of the assembly dates in vital. It prepares the company to plan ahead about the skill and labor to be used. Early planning in such an assembly company is vital since there is ample time to dwell on design and drawing required by the importing customers. The probability of completion of door assembly of doors in 18.5 days is less than 0.5. However, from the crystal ball statistical analysis, the probability of completion of assembly in less than 10.0 days is more than 0.5. This computational analysis is dependent on the changes in economic order quality, input costs and labor inputs from the assembly team.

The estimated economic order quantity for the produced windows is estimated to be 63. Both estimated steady and actual states of the deliveries in 2009 are not up to the standard economic order quantity. During some months, the deliveries are slightly higher to the steady levels and exceedingly low. The months of September and December and April depict this respectively. Costs of running low EOQ are indirectly proportional to the inventory management costs. By incorporating the new EOQ of 63, the amount incurred in managing a new inventory will be relatively low, due to increased EOQ, compared to the one used in 2009.

Late delivery of door in the stipulated windows incurs penalty costs from the importing company. In accordance to the contract, HAL would be responsible by paying a 2% penalty from the total price of a single door. This amounts to $1,000. In the year 2009, the company had 78 late deliveries, out of the total 227. This cost the company a total of $78,000 in penalty.

Recommendations

Protagonists to the delivery problem have suggested reliable means that can be adopted by the door assembly plant. It is necessitated that the plant back in India to trounce variability in the manufacturing of the doors. Proper management strategies are to be drawn in running the maintenance of the parts and equipment for production of the doors. In the same way, inventories' costs of management should be designed to handle the door outsourcing by the external assembly plant and shelf life of HAL's door assembly. Leftovers should be utilized in other methods before the arrival of other shelf life within the six…

Sources Used in Documents:

Resources and manpower utilized in the prior assembly are also availed during the schedules assembly time. Effectuating prior production will not incur other extras costs. Through this, HAL will retract their earlier procedures and develop effective modes of ensuring earlier pre-assembly of the doors.

In addressing the uncertainties encountered, the supply chain management is recommended to ensure strict time schedule of working upon all phases of assembly. Similarly, having storage forms of the arriving shelf life and transportation modes is convenient. This will counter future risks exposed to the staff in assembling the doors. Fulfillment of these organizational recommendations will eventually suppress delivery gaps in the windows stipulated in the contract.

It is highly recommended that the company's supply chain management re-inculcates computations in quantity of ship-sets released, breakdown costs on inputs being used and other critical consumables. The EOQ of HAL door assembly should be raised to high levels; so as to bring in additional costs resulting from low running costs from the new assembled products. Through this, unit acquisition costs will be reduced with purchases of larger quantities. Additional costs can offer more reliable transport system in, hence enabling the importing company to be more dependable on HAL.

Conclusion

Despite the hurdles of delivering the passenger doors in time, Hindustan Aeronautics Limited has been at the fore front of producing most doors used by many airbuses. The company has also partnered with other assembling plants and suppliers in addressing their earlier constrain. Instantly, it has had established departmental entities in the company to deal with the problems associated with delivering the doors and other products to other manufacturing companies. The new notion comprehensively overlooks at the conceptual design methodology of setting up customer -- benefit supplies and low costs from inventory management, follow-ups, monitoring process and supervisions to the delivery chain.


Cite this Document:

"Hindustan Aeronautic Limited Delivery Of Doors Hindustan" (2012, March 30) Retrieved April 19, 2024, from
https://www.paperdue.com/essay/hindustan-aeronautic-limited-delivery-of-78960

"Hindustan Aeronautic Limited Delivery Of Doors Hindustan" 30 March 2012. Web.19 April. 2024. <
https://www.paperdue.com/essay/hindustan-aeronautic-limited-delivery-of-78960>

"Hindustan Aeronautic Limited Delivery Of Doors Hindustan", 30 March 2012, Accessed.19 April. 2024,
https://www.paperdue.com/essay/hindustan-aeronautic-limited-delivery-of-78960

Related Documents

NASA classified the mission as a "Successful Failure" because the crew was rescued in time to avert any fatalities (Frasketi, 2010). The spent upper stage was successfully impacted in space. This mission was however characterized by an astronaut exposing his colleagues to German measles days before the flight. One of the astronauts had no immunity to the measles and had to be replaced by another module pilot. The flight

The obvious branch to enlist in is the air force, though actually the army and navy both have aeronautics engineering programs, too (Glenn Research Center). Enlisting can be tricky, especially with worried parents, but when it is the only way of achieving your goals then some risks must be taken. After enlisting comes boot camp, which most people know is no picnic. Luckily, air force boot camps are not

It also develops and integrates spacecraft systems and subsystems, electronic and communications payloads, intercontinental ballistic missile systems, and high energy laser systems and subsystems in the areas of space, defense, and electronics technology (Northrop Grumman Corporation (NOC), 2009). The Raytheon Company designs, develops, manufactures, integrates, and supports technological products, services, and solutions for governmental and commercial customers in the United States as a well as internationally. It does business in

For instance, currently the law says that any use of UAVs in civil airspace must be preceded by a detailed flight plan 30 days in advance of the scheduled flight. Some advocates of UAVs, including the U.S. military and aeronautical manufacturers, want to change this to allow flights on the same day a flight plan is filed -- just as with traditional aircraft (Graham-Rowe, 2003). The legitimate fear is

D.). Having the most profound impact on containerization and cargo-handling operations were the number of huge containerships that came online in the mid-1990s. In order to replace wasteful ships, meet shippers' demands, and maximize loads, larger, faster and more efficient containerships began to be introduced. The largest, dubbed super containers or post-Panamax vessels were engineered to carry 4,000 to 5,000 20-foot equivalent units (TEUs), rather than the most prevalent generation capacity

Percentage (a) System operated unsafely during maintenance 80 13 Incomplete installation 48 8 Maintenance worker contacted hazard 45 7 Incorrect assembly or location 44 7 Towing event 44 7 Vehicle or equipment contacted aircraft 31 5 Material left in aircraft 27 4 Wrong equipment or part installed 23 4 Part not installed 22 4 Part damaged during repair 21 3 Panel or system not closed 21 3 Required service not performed 20 3 Failure of component or tool 15 2 Fault not found