Closing A Project Is A Case Study

PAGES
4
WORDS
1298
Cite

The project manager should bring the team together at strategic points during the project cycle to determine what is working and what has to be fixed before moving on to the next phase. Allen recommends that there should be three goals of a retrospective: review the project from a number of different perspectives; capture and record details on what worked and what must be improved; and finally, create an action plan for implementing changes. (Allen, 2007) Case Studies

Army Program Management in Afghanistan

Three field-grade U.S. military officers collaborated to produce a case study of their nation-building experiences in Afghanistan. (Ruhm, Marsh & Cooley, 2006) They argue persuasively that the use of program (project) management techniques have been helpful to the military leadership in the rebuilding of Afghanistan's infrastructure, institutions, government and Army. The starting point in managing any project is to establish the "baseline," which serves as the contract between the customer and the provider concerning cost, schedule, and performance. The authors found that documenting the baseline was essential for making decisions, but also for communicating with external (including Congress) and internal audiences. The use of scheduling techniques was useful when dealing with numerous linked and interdependent subsystems. In particular, this project was organized to increase the effectiveness of the Afghan military personnel. In that regard, the managers made use of capability milestones. "When will the Afghans stand up to the requirements of defending themselves?"

Zuquala Steel Mill

Wondimu Degnitu, head of Ethiopia's Project Engineering Unit, reported on the case of the construction of a steel rolling mill in Zuquala. The Ethiopians negotiated a deal to purchase an existing steel mill in South Africa. The terms included assistance from the South Africans in moving the plant, as well as their full participation in the reassembly and turnkey operations. Degnitu dwells on the importance of detail planning of the project from gathering high level requirements down to sub-activities showing "duration, accomplishment and responsible person." (Degnitu, 2000)

Common Attributes

These...

...

However, there are several attributes that the projects share in common. 1) the need for a contract plan: the Army called it setting down a Baseline and Zuquala referred to Overview Planning, but both recognized that it consists of "group generated ideas rather than an analytic process." 2) Requirement for detailed planning: the Army team described the toolkit of a project manager, with its most important tool being scheduling, while Zuquala referred to detail planning and scheduling. 3) Both teams recognized the desirability of in-process reviews. Zuquala utilized daily project meetings to review potential problems and to initiate preventive and contingent actions. The Army team had to deploy its plans in a rough form as soon as possible and "then evolve and grow them into more mature and capable systems over time." 4) Finally, there is no evidence in either case write-up that the teams actually conducted a formal closing process.

Sources Used in Documents:

References

Allen, Stacy Ann (2007, July), How to Run a Project Retrospective, LDS Tech. Retrieved March 3, 2011 from https://tech.lds.org/forum/showthread.php?2564-How-to-Run-a-Project-Retrospective

Degnitu, Wondimu (2000, September), a Case Study of Zuquala Steel Rolling Mill, Journal of the ESME, Vol III, No. 1. Retrieved November 10, 2010 from http://africantechnologyformum.com/ESME/prjmgmt/Zuquala.htm

Elyse (2006, November), Closing Process Group, Anti-Clue. Retrieved March 3, 2011 from http://www.anticlue.net/archive/000736.htm

Merron, Jeff (2011), Project Management Best Practices, Studio One Networks, Retrieved March 3, 2011 from www.itbusinessnet.com/articles/viewarticles.jsp?id=1384247
Ruhm, Brian C., Marsh, Adrian, & Cooley, William T. (2006), Building an Army -- Program Management in Afghanistan. Retrieved November 10, 2010 from http://www.pmforum.org/library/cases/2006/08.htm
Standish Group, (2011), CHAOS. Retrieved March 3, 2011 from http://www.marketresearch.com/vendors/viewVendor.asp?VendorID=2514


Cite this Document:

"Closing A Project Is A" (2011, March 05) Retrieved April 16, 2024, from
https://www.paperdue.com/essay/closing-a-project-is-a-4306

"Closing A Project Is A" 05 March 2011. Web.16 April. 2024. <
https://www.paperdue.com/essay/closing-a-project-is-a-4306>

"Closing A Project Is A", 05 March 2011, Accessed.16 April. 2024,
https://www.paperdue.com/essay/closing-a-project-is-a-4306

Related Documents

Portfolio Management The objective of Part A of this study is to analyze the key best practices that the organization can adopt to improve its project management maturity level and to examine and describe the key elements of change management, which could be used during an initiative to raise the project maturity level of an organization. OPM3 has specific benefits to the organization in that it makes provision of a method

Consequences of Not Properly Closing Projects There are many consequences of not properly closing out a project that can affect the success of the project or the program for many years to come. One of the most important aspects of closing is documenting lessons learned; especially in organizations that run multiple projects. For example, in many IT projects there are lessons learned throughout the project that can affect future related projects

" There are several benefits that a global consumer electronic firm could derive from inter-project learning. First, inter-project learning allows firm to enhance project completeness. Prencipe, & Tell (2001) argue that inter-project learning allows firms to execute a project in a best method. In the present competitive market environment, project is the key to the dynamic competitive capabilities. Typically, accumulation of knowledge builds project competencies, which could enhances market performances of a

Project Management February J. 2014 A project is a temporary group of activity designed to produce unique products and services or results. Typically, a project has a defined beginning and end and therefore having defined scope and resources. (Pierre, 2012). A project also has a specific set of operations to accomplish a singular goal. Examples of projects are as follows: Development of software to improve business process, Construction of bridge or building, Expansion of sales

Project Management Email Response Choosing a Project In order to determine which of the three projects is best, it is important to conduct a feasibility study. That is done to take a careful look at each one of the projects offered and examine what they provide to the company in the future. Of course, it is not possible to know exactly what will happen, and there are only projections and assumptions that

Project Management Organizational Structures A project is a variety of jobs that relate and point towards a critical solution. For a project to function successfully, money, time, resources, and personnel is required. Project management often dictates control of resources together with planning the intended project and designating resources in areas where they are needed. Before the start of a project, the management decides upon which organizational structure will be effected to