Construction Project Risk Management the Research Paper

Download this Research Paper in word format (.doc)

Note: Sample below may appear distorted but all corresponding word document files contain proper formatting

Excerpt from Research Paper:

Chapman (2001) equated the dangers explained within the Central Computer and Telecommunications Agency Publication "Management of Project Risk" into the design threats that included however were not restricted to "trouble in catching and pointing out the individual requirements," "problem of approximating the time and resources needed to finish the design," "trouble of gauging development throughout the advancement of the design." Chapman likewise specified that the design group's thorough expertise of the sources of danger can considerably affect the recognition of threats in the design stage of a project. Abdou (1996) further categorized the different construction dangers into 3 teams, i.e. construction finance, construction time and construction design, and dealt with these threats in light of the various contractual associations that exist amongst the useful entities associated with the design, advancement and construction of a project.

Threat category is a considerable action in the risk management procedure, as it tries to structure the varied dangers influencing a construction project. In order to handle dangers successfully, lots of strategies have actually been recommended in the literature for categorizing threats. Perry and Hayes (1985) provided a listing of aspects removed from a number of sources which were divided in regards to dangers retainable by service providers, experts and customers. Integrating the holistic strategy of general systems concept with the discipline of a work breakdown framework as a structure, Chapman (2001) organized threats into 4 parts: environment, sector, customer and project. Of the total fifty-eight recognized threats connected with Sino-Foreign construction joint endeavors, Shen (2001) classified them into 6 teams keeping in mind to group together those dangers that were of the same nature and the groups were as such: monetary, legal, management, market, policy and political, in addition to technical dangers. In a word, numerous methods can be made use of to categorize the dangers connected with construction tasks. For this proposed paper, the research group intends to look for threats from the point-of-view of project stakeholders and life cycle, and thus categorizes the dangers in accordance with their interest by the investors and stakeholders.

Output analysis and discussion

Risks associated with customers

A total of 4 essential dangers are connected to customers. "Tight project booking" was ranked as the most substantial threat amongst all talked about elements, which infers that creating a suitable booking in the conceptual/feasibility stage is even more useful to the project distribution and completion. The customers ought to prepare a useful booking enabling structure however not redundant time to enclose all plan and construction tasks. As time and expense are constantly carefully correlated, a prolonged booking will unquestionably damage the project expense perk. "Variations by the customer" can directly lead to modifications in the preparation, plan and construction. Variations in the plan are potentially caused by 2 reasons, the modification of the requirements by the customers or the misconception of the customers' requirements in the initial project brief. For the previous source, the customers will bear the obligation; for the latter one, an experienced preliminary project group will be needed as early as possible to specify the project scope and features specifically. "High performance/quality expectations" is also an integral aspect in the majority of customers' mind, which nonetheless could imply the sacrifice of project expense, time as well as security. The result of the project could likewise outreach the marketplace or the customers' requirements. Thus, customers must specify the performance/quality of the proposed jobs based upon logical research of their own and/or the marketplace requires. "Incomplete approval and various other papers" generally takes place due to management weak point of the project schedules or the bureaucracy of government. Customers have to develop a qualified group to acquire the approval from government companies and prepare project files successfully and time efficiently.

Risks connected to designers

Likewise, a total of 4 crucial threats associated with designers were discovered. "Design variations" widely emerged in the design stage of a project and might cause problems such as "variations by the customer" and malfunctioning designs. To prevent malfunctioning design, the design group need not to only comprehend exactly what the customers' desire as specified in the project short, however they must also be able to develop an effective communication scheme amongst the designers. "Inadequate program organizing" typically appears in jobs with a tight booking when some programs have to be decreased to fulfill the project timeline. Additionally, unpredictability restricts most elements of construction jobs, which makes it impossible to properly forecast the time needed for numerous programs. Picking seasoned designers can assist to decrease the differences in between the proposed and useful program bookings. "Incomplete or incorrect expense quote" is directly connected to the designers/consultants' expertise and mindset to work. As formerly pointed out, numerous unexpected aspects are involved in any and all construction tasks, which frequently deviates the approximated expense from the genuine expense. Picking accountable and seasoned designers as well as possibly attaining the contractors/subcontractors early can assist to lighten up the load and decrease the probability of the booking mistake. "Inadequate or not enough location or onsite info (soil/ground/surface examination and study report)" can impact the development of excavation, structure and footing construction. Before the plan of any construction design is made, bore opening, soil/ground/surface examination and research or surveys with the government firms and close-by structures need to be carried out to establish the location or onsite conditions and minimize unanticipated dangers.

Suggestion of the renovation

The referral we make is that customers, designers and government bodies ought to work collectively and collaboratively from the feasibility stage onwards to resolve prospective threats successfully and in time; professionals and subcontractors with durable construction and management understanding have to be utilized early to recognize efficient preparation for performing safe, effective and quality construction tasks.

Future work

The future researches on risk management in construction can develop on the threat elements currently determined and research them under various exterior elements.


While the majority of research has actually concentrated on some facets of construction risk management, this research ventured to recognize vital threats connected with the accomplishment of all project goals in regards to expense, time, quality, environment and security. On the basis of a study with market specialists having durable experience and expertise of construction tasks, some crucial threats were highlighted on an extensive evaluation of their chance of event and level of affect on project goals.


Abdou, O.A. (1996) Managing Construction Risks, Journal of Architectural Engineering, 2(1), 3-10.

Ahmed, S.M., Ahmad, R. And Saram, D.D. (1999) Risk Management Trends in the Hong Kong Construction Indus try: a Comparison of Contractors and Owners Perceptions, Engineering, Construction and Architectural Management, 6(3), 225-234.

Baker, W. And Reid, H. (2005) Identifying and Managing Risk, Frenchs Forest, N.S.W.: Pearson Education.

Baloi D., & Price a., 2003, Modeling global risk factors affecting construction cost performance, International Journal of Project Management 21, pp 261-269.

Bender W., Ayyub B., 2001, Risk-based Cost Control for Construction, Construction Management Department, Central Washington University.

Berkeley, D., Humphreys, P.C. And Thomas, R.D. (1991) Project Risk Action Management, Construction Management and Economics, 9(1), 3-17.

Chapman RJ, 2001, the controlling influences on effective risk identification and assessment for construction design management, International Journal of Project Management 19, pp 147-160.

Chen, H., Hao, G., Poon, S.W. And Ng, F.F. (2004) Cost Risk Management in West Rail Project of Hong Kong, 2004 AACE International Transactions.

Flanagan, R. And Norman, G. (1993) Risk Management and Construction, Victoria: Blackwell Science Pty Ltd., Australia.

Perry, J.H. And Hayes, R.W. (1985) Risk and Its Management in Construction Projects, Proceedings of the Institution of Civil Engineering, Part I, 78, 499-521.

Schuyler, J. (2001). Risk and Decision Analysis in Projects (second edition), Pennsylvania: Project Management Institute, Inc., USA.

Shen, L.Y. (1997). Project Risk Management in Hong Kong, International Journal of Project Management, 15(2), 101-105.

Shen, L.Y., Wu, G.W.C. And Ng, C.S.K. (2001) Risk Assessment for Construction Joint Ventures in China, Journal of Construction Engineering and Management, 127(1), 76-81.

Smith, N.J. (2003). Appraisal, Risk and Uncertainty (Construction Management Series), London: Thomas Telford Ltd., UK.

Tam, C.M., Zeng, S.X. And Deng, Z.M. (2004) Identifying Elements of Poor Construction Safety Management in China, Safety Science, 42, 569-586.

Uher, T. (2003) Programming and Scheduling Techniques,…[continue]

Cite This Research Paper:

"Construction Project Risk Management The" (2013, April 23) Retrieved October 25, 2016, from

"Construction Project Risk Management The" 23 April 2013. Web.25 October. 2016. <>

"Construction Project Risk Management The", 23 April 2013, Accessed.25 October. 2016,

Other Documents Pertaining To This Topic

  • Construction Project Risk Management Risk

    5.4: Accept Bullring team accepted some risks; however, the company developed the effective cost and schedule strategies to manage these risks. For example, the company allotted sufficient fund to militate against risks associated with the project costs and schedule. Table 2 presents the compressive list all the risks deemed to affect the outcome of the Bullring project. Table 2: Associated Risks on the Project Cost Related Risks: Index Scores Tight project schedule 0.67 Design variations 0.49 Project variations from

  • Construction Project Risk Management Objective

    "Brainstorming, scenario planning, and expert interviews is the tools highway engineers commonly use in routine engineering and construction management tasks." (U.S. Department f Transportation 2007 P. 2). Table 3 reveals the summary of the tools and technique in the risk identification process. Table 3: Risk identification tools and techniques PROJECT-SPECIFIC DOCUMENTS PROGRAMMATIC DOCUMENTS TECHNIQUES Project description Work breakdown structure (WBS) Cost estimate Construction schedule Procurement plan Team issues and concerns Historic data Checklists Final project reports Risk response plans Organized lessons learned Published commercial databases Academic

  • Project Risk Management Manage Project

    The project manager should at all times be present to monitor and ensure that it's the correct mixing of materials being done, it's the right quality of material being used, and it's the right amount of time being given to the treatment process in the different construction phases. In the event that this is not observed, and the building is erected, there's a high probability that the building will

  • Construction Project Management the Focus

    (in its turn, the financial environment must be understood with reference to the wider economic situation.) Cost control is the activity which compares cost performance against the cost plan, adjusting one or the other dynamically by reference to the changing circumstances in the project's financial environment. (Hughes, 1991, p.1) 2. Time Control -. Timing is influenced by many environmental factors, but the client's attitude to the timing of the project

  • Construction Risk Management of Channel

    In addition, Sound Transit has installed eight sensing devices for the building, including probes that would register any soil shifting at the tunnel depth. Such alerts would allow Sound Transit time to apply extra grout between the tunnel and the apartment building's basement. 6. Output Analysis and Discussion Here, Sound Transit has taken reasonable and economically feasible precautions to reduce the risk of damage from soil sliding. At this point, the remaining

  • Risk Management in British Hedge Funds

    Risk Management in Hedge Funds A research of how dissimilar hedge fund managers identify and achieve risk The most vital lesson in expressions of Hedge Fund Management comes from the inadequate name of this kind

  • Construction Project Management Project Management

    Conclusion In understanding the facets of a PFI/PPT construction endeavor, one must first understand the aforementioned facets of the partnership that will come into play from the construction project's inception to its completion. The decision to engage in such an endeavor is clearly one that is subjective, but should be undertaken carefully in gauging the risks involved. References Akintoye, A., Bing, L., Edwards, P. And Hardcastle, C. (2004). Risk allocation preferences in PPP/PFI

Read Full Research Paper
Copyright 2016 . All Rights Reserved