Information System Management, Zackman's Approach Article Review

Such a basis would agree that a superior usage of technology is not near-change mechanism. Zachman argues that a communication breakdown exists in the organization (by that time) because it handled the frameworks differently. This was not in line with the requirements of a desirable organization. Further to this, communication channels inside the organization have improved and not according to Zachman's times in the 21st century. While responding to Zachman, it is good to establish whether the current approach (data modeling / and hybridism for large calls and the superior application of technology) is satisfying (Bowman, Godfrey, & Holt, 2000). As a result, future studies should apply the future design system that will integrate Zachman's ideas into real time environment whilst acknowledging the impetus behind data modeling. The following research questions will be decisive in responding to considerate challenges.

Can data modeling be applied to respond to issues of organizational management?

Is data modeling a collective ideology, and largely does it acknowledge Zachman's original ideas?

Is there any relationship between real time technology and the quality of management?

Conclusion

This analysis has attempted to prove that Zachman information system approach (EAP) is not responsive enough in mitigating contemporary organizational problems. The underlying reason is that contemporary organizations have the considerate degree of Information Technology. However, it fails to provide a subsequent justification of Zachman's approach. In response to this, the research has provided a subsequent application of data modeling whilst issuing significant...

...

2006).

Sources Used in Documents:

References

Bigot, L.L., Jamet, E., Rouet, J., & Amiel, V. (2006). Mode and modal transfer effects on Performance and discourse organization with an information retrieval dialogue system in natural language. Computers in Human Behavior, 22(3), 467-500.

Bowman, I., Godfrey, M., & Holt, R. (2000). Connecting architecture reconstruction frameworks. Information and Software Technology, 42(2), 91-102

Huysman, M. (2000). Rethinking organizational learning: analyzing learning processes of information system designers. Accounting, Management and Information Technologies, 10(2), 81-99

Raeesi, M., & Sadeghi-Niaraki, A. (2013). Gis-Based System For Post-Earthquake Crisis Management Using Cellular Network. ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XL-1/W3, 321-325.
Simson, G. (2005, January 1). The Data Administration Newsletter -- Tdan. Comrobert S. Seiner -- Publisher. What's Wrong With The Zachman Framework? Retrieved May 9, 2014, from http://www.tdan.com/view-articles/5279/


Cite this Document:

"Information System Management Zackman's Approach" (2014, May 09) Retrieved April 25, 2024, from
https://www.paperdue.com/essay/information-system-management-zackman-approach-189037

"Information System Management Zackman's Approach" 09 May 2014. Web.25 April. 2024. <
https://www.paperdue.com/essay/information-system-management-zackman-approach-189037>

"Information System Management Zackman's Approach", 09 May 2014, Accessed.25 April. 2024,
https://www.paperdue.com/essay/information-system-management-zackman-approach-189037

Related Documents

New Payroll Application Architecture One of the most commonly automated business processes and operations in the recent past is payroll, which is also the most often used human resource solution. The increased use and automation of payroll is attributable to the need to ease and reduce the time spent in payroll processes, which is one of the first applications in the working environment. Despite the increased automation of payroll, there are

However, the company did feel it should develop its own Database infrastructure that would work with the new underlying database management system and would mesh with existing organizational skills and the selected enterprise software solution. Because the company followed a standardized implementation process, they were able to successfully reengineer their existing business structure. The objective of the System Development Life Cycle is to help organizations define what an appropriate system

system development life cycle (SDLC) approach to the development of Information Systems and/or software is provided. An explanation of SDLC is offered, with different models applied in implementing SDLC delineated. Advantages and disadvantages associated with each of the models will be identified. System Development Life Cycle According to Walsham (1993), system development life cycle (SDLC) is an approach to developing an information system or software product that is characterized by a

Evolution of System Performance: RISC, pipelining, cache memory, virtual memory Historically, improvements in computer system performance have encompassed two distinct factors: improvements in speed and also improvements in the number of applications which can be run by the system. Of course, the two are interlinked given that high levels of speed are linked to expansions of short-term memory and the ability of computers to use that memory to perform critical functions. One

From approximately 1930 until the 1980s, rectangular and functional spaces were the chief form of architecture around the world in general. The latter part of the 20th century -- the 1980s onward -- saw change once again, however (2008). For the most part, 20th century architecture, however, "focused on machine aesthetics or functionality and failed to incorporate any ornamental accents in the structure" (2008). The designs were, for the

Third myth is "the industry is going "plug and play" or "do-it-yourself" and does not require specific integration efforts, given greater systems diversity but "although experiments are underway to use cable modems and set-top controllers for more than just entertainment delivery, the current generation of devices does not pretend to be a true systems integration controller." Project managers and architecture designers are still necessary for electrical contractors to fully integrate