Case Study Undergraduate 1,198 words

Quality control failures at Stooges Manufacturing after expansion

~6 min read 3 sections Business
Abstract

This paper is about operations management. It is a case study about a manufacturing firm that is facing a significant error rate in product that is going to its largest customer. Using statistical data, the source of the error is identified, as are the larger issues that have allowed such errors to make it out of the factory in the first place.

✍️ How to write this paper — tools & examples ▾
Essay 1,198 words

¶ … mallets are not meeting the customer specifications. This could cost Stooges significantly, for a couple of reasons. The first is that returns and products not to spec represents a waste of materials -- a cost of goods sold that will not be offset by revenues. Further, the company expanded on the basis of its contract with Slapstick. Its quality reputation helped land it this deal. The major problem here is that if the Slapstick cancels the contract because of these quality issues, then Stooges is going to face major solvency problems, without their biggest customer and with a debt overhang from their expansion.

There are several underlying issues that all contribute to the quality problems. The first is that there is a lack of quality culture at Stooges. The company was successful at quality control when it was smaller, and management seems to have assumed that this quality culture was inherent, did not need to be taught, and would carry over after the expansion. That assumption shows a lack of leadership with respect to quality, and it is therefore no surprise that the company lacks formal systems and that its quality outcomes were less than desirable.

The lack of a coherent quality management system is clearly an issue, as management has never put one in place. Even now, the company is not entirely sure why the problems are occurring, which should raise a red flag about its preparedness to overcome this issue. Without facts and analysis, Stooges right now is a long way from solving its quality problems. A system with objectives, tactics, training and measures needs to be put into place as soon as possible.

There are more minor issues as well. With the expansion, the company added another shift and this has clearly lowered its overall quality capabilities. Running with three shifts creates a number of problems. There are more workers, and there are periods (overnight) when there is no senior management presence on site. Further, running three shifts reduces the opportunity for maintenance on the equipment. Workers overnight are also more likely to be tired and make mistakes. Another issue is the pressure that the workers are under with the new contract. Pressure creates a motivation in the workers to relieve that pressure. Thus, if management does not specifically orient workers towards quality objectives, the workers will assume that output is the most important objective, and work towards output, sacrificing quality if need be. This misguide motivation is compounded by the lack of a strong quality control culture and the lack of coherent quality control systems at Stooges. Just in time delivery has been cited as a source of the pressure, but JIT has been implemented by companies all over the world without having these problems -- management's response to JIT is the problem.

Facts

The spreadsheet with the test data on the diameters of the cut reveals how the company is performing with respect to quality. According to the calculations, 39 samples out of 150 were found to be out of spec, a total of 6%. Of these, all 9 were cut to a smaller size than the allowable deviation. Only 9 in total (6%) were cut exactly to 16.5 inches.

The error rate of 6% is entirely unacceptable. This means that if 10,000 mallets are inspected at random, 600 would not be to the customer's specifications. These types of numbers confirm that the problem is as bad as was thought. Not only is the contract at risk, but the 6% reject rate must eradicate the profit margin that Stooge would prefer to be earning. The problem needs to be fixed, with target rates much closer to something like the Six Sigma defect rate of 3.4 ppm. The current rate extrapolates to 60,000 per million, so there is a bit of work to be done here.

Follow-Up and Contingency Plans

In the long run, it is important to learn from this experience. The company needs a stricter quality control system. In particular, there needs to be a culture and system of measurement that will allow management to identify problems before they reach the customer. Many problems are relatively simple to diagnose and resolve, including the current problem. Now that the company recognizes that it needs to take quality control more seriously, it should begin by working with its production team on ways to ensure that quality is enhanced. This can involve things like training and a routine maintenance schedule for the equipment. The workers are likely to identify other things that put quality at risk.

There should also be a contingency plan. The company should have a small supply of mallets produced ahead of time. This does not mean carrying a huge amount of inventory, but JIT places a certain amount of risk on the supplier with respect to the cost of defects. Should a defect occur, the company should have some supply that can be used to fill out the order without having to rush replacements. This should not be too onerous, especially compared to the costs associated with having to find a new number one customer. It is also important at this stage to inform the customer and ensure that the customer is aware that all of the issues have been identified and resolved, so that the customer knows that there is no risk of recurrence.

297 Words Hidden
Tentative Solution297 words
At this point, the problems are massive and existential. There needs to be some sort of move to staunch the bleeding (of red ink, of…
References
1 sources cited in this paper
  • Jacobs, F. R. and Chase, R.B., (2011). Operations and supply chain management. 13th ed McGraw-Hill/Irwin, New York, NY
Key Concepts in This Paper
quality control manufacturing defects Six Sigma production management Slapstick contract shift operations statistical process control
Cite This Paper
PaperDue. (2013). Quality control failures at Stooges Manufacturing after expansion. PaperDue. https://www.paperdue.com/essay/mallets-are-not-meeting-the-customer-specifications-127163

Always verify citation format against your institution’s current style guide requirements.